Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD16-04550
StatusFinaled
Name KB FINANCIAL LLC
Site Address 2240 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberBLD16-04549 EPLAN
ePlanReview 
Description
(2 PERMITS TOTAL FILED UNDER BLD16-04549 IN EPLANREVIEW) DRH14-00164/PUD14-00006; WUI Zone A; Permit for the construction of a new 1904 sq. ft., two story (first story 786 sq. ft., second story 1118 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 121 sq. ft. of covered patio/porch and a 492 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1C zoning and setbacks per planning. //leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/19/20184/20/20184/20/2018PPASS
DetailsTony Young
Ron; Phone #: ###-####
DOC - Permit Finaled4/20/20184/20/20184/20/2018PPASS
DetailsTony Young
BLD-Final4/18/20184/18/20184/19/2018PPEND
DetailsTony Young
Ron; Phone #: ###-####
BLD-Final4/17/20184/18/20184/18/2018APEND
DetailsTony Young
Ron; Phone #: ###-####
BLD-Final4/13/20184/17/20184/17/2018APEND
DetailsTony Young
Ron; Phone #: ###-####
BLD-Final4/12/20184/17/20184/17/2018APEND
DetailsTony Young
Ron; Phone #: ###-####
BLD-Final4/13/20184/13/20184/13/2018PPEND
DetailsTony Young
Ron; Phone #: ###-####
BLD-Final4/12/20184/13/20184/13/2018APEND
DetailsTony Young
Ron; Phone #: ###-####,, needs hillside pass
BLD-Conference3/6/20183/7/20183/7/2018APART
DetailsTony Young
handrail conf // Ron Phone #: ###-####
BLD-Conference3/5/20183/6/20183/6/2018APART
DetailsTony Young
handrail conf // Ron Phone #: ###-####,, needs 1 1/2" clear
BLD-Foundation3/5/20183/6/20183/6/2018ACANC
DetailsTony Young
rebar // Austin Phone #: ###-####
BLD-Energy code compliance1/8/20181/9/20181/9/2018APASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Wall Bracing1/2/20181/3/20181/3/2018APASS
DetailsTony Young
Ron Phone #: ###-####
BLD-Framing/Rough-in12/29/20171/2/20181/2/2018APART
DetailsTony Young
Ron Phone #: ###-####,, firewall fix has been established ,, ok to continue and insulate
BLD-Conference12/29/201712/29/201712/29/2017PPASS
DetailsTony Young
Ron Phone #: ###-####,, discuss firewall fix on west unit per architect
BLD-Conference12/14/201712/14/201712/14/2017PPEND
DetailsTony Young
Ron Phone #: ###-####,, firewall ?s,, needs to get architect on site
BLD-Framing/Rough-in12/12/201712/14/201712/14/2017ANR
DetailsTony Young
Ron Phone #: ###-####
BLD-Framing/Rough-in12/8/201712/12/201712/12/2017ADEFR
DetailsJim Storey
Ron Phone #: ###-#### to tony for thur. am
BLD-Wall Bracing11/27/201711/28/201711/28/2017AFAIL
DetailsBrandon Shaw
Ron Phone #: ###-####.see correction notice and red paint.

OK to cover exterior only.
BLD-Other11/8/201711/9/201711/9/2017PPART
DetailsTony Young
fire wall // Aaron Phone #: ###-####,, upper patio walls ok,, work in progress on trusses on ground
BLD-Other11/1/201711/1/201711/2/2017PPART
DetailsBrandon Shaw
Fire wall, work in progress
BLD-Other10/19/201710/20/201710/20/2017APART
DetailsTony Young
Aaron-fire wall Phone #: ###-####,, screw pattern on main level ok
BLD-Foundation8/18/20178/18/20178/18/2017PPART
DetailsTony Young
Rebar // Austin Phone #: ###-####,, work in progress
BLD-Concrete8/10/20178/11/20178/11/2017APASS
DetailsBrandon Shaw
rebar- Austin Phone #: ###-####
BLD-Footing2/10/20172/14/20172/14/2017ANR
DetailsTony Young
Austin Phone #: ###-####,, need soils approval