BLD-Final | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call Bryan at 208.286.8679. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Brandon Shaw
|
|
|
Please reference engineering compliance letter.
|
BLD-Wall Bracing | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Brandon Shaw
|
|
|
Please reference engineering compliance letter.
|
BLD-Wall cover | 12/14/2017 | 12/15/2017 | 12/14/2017 | A | CANC |
Brandon Shaw
|
|
|
Thanks Bryan Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Conference | 11/22/2017 | 11/22/2017 | 11/22/2017 | A | DEFR |
Brandon Shaw
|
|
|
Per conference 11/21/17
Corrections to wall bracing to be as per revised engineering. Bryan is to have Engineer of record inspect braced walls and framing. Submit revisions as needed. Work In Progress
|
BLD-Wall Bracing | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | NR |
Jim Sly
|
|
|
C/N posted......besides what is on notice, Window that was in West Garage wall got moved to the North ......Compromising Braced wall line B. Engineer to advise. Missing a lot of blocking in that wall. Double Check approved plan for window and door locations.
|
BLD-Energy code compliance | 8/10/2017 | 8/11/2017 | 8/10/2017 | A | CANC |
Tony Young
|
|
|
Please call Brent with Marv''s at ###-#### with any questions on Insulation. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Foundation | 8/2/2017 | 8/3/2017 | 8/4/2017 | P | PART |
Brandon Shaw
|
|
|
Jack Phone #: ###-####
|
BLD-Foundation | 7/27/2017 | 7/28/2017 | 7/28/2017 | P | PART |
Brandon Shaw
|
|
|
Stem walls, upper portion retaining walls
|
BLD-Foundation | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | PART |
Brandon Shaw
|
|
|
Phase III, footings for retaining walls
|
BLD-Foundation | 6/23/2017 | 6/26/2017 | 6/26/2017 | P | PART |
Brandon Shaw
|
|
|
Phase I, house foundation.
|
BLD-Foundation | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Jack Phone #: ###-####
|
BLD-Foundation | 6/6/2017 | 6/7/2017 | 6/7/2017 | P | NR |
Brandon Shaw
|
|
|
Jack Phone #: ###-#### Waiting for Geotech report.
|