BLD-Final | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Jim Storey
|
|
|
Tyler Phone #: ###-####
|
BLD-Final | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PART |
Mike Jordan
|
|
|
Tyler Phone #: ###-####. Ok for temp occ. All stairway sing issues have been resolved. Work in progress on correcting ADA issues in indivdual units.
|
FIRE-Final Inspection | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Tyler Phone #: ###-####
|
BLD-Final | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | NR |
Dave Hannah
|
|
|
Tyler Phone #: ###-#### needs other trades to final or go to tco also walked site they have several ada items that will need to be fixed also signage in stair towers
|
FIRE-Final Inspection | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved fire life safety notes for items that need corrected which include signage, repair one exit sign, final on fire alarm permit, painting on curbing...ect.
Tyler Phone #: ###-####
|
BLD-Other | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | PART |
Jim Storey
|
|
|
2nd & 1st floor door swings - Tyler Phone #: ###-#### ok all but 4th east stair and1st hall way
|
BLD-Other | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Jim Storey
|
|
|
fire colking // Tyler Phone #: ###-#### ceillings ok to cover.
|
BLD-Other | 6/14/2018 | 6/15/2018 | 6/15/2018 | P | NR |
Mike Jordan
|
|
|
fire caulking, remainder of first floor - tyler Phone #: ###-####. Needs to firecaulk sheet rock at fireproofed beams as per plans.
|
BLD-Conference | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | DONE |
Troy Cobbley
|
|
|
This was a conference with the fire inspector to verify that the fire alarm system was actively monitoring the sprinkler system and that the sprinkler system was live. Furniture can be moved into the project as long as both the fire alarm system and fire sprinkler systems remain active.
Tyler-- conference for fire life safety Phone #: ###-####
|
BLD-Conference | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Jim Storey
|
|
|
Tyler Phone #: ###-#### doors 3rd and 4th ok
|
BLD-Conference | 6/4/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Jim Storey
|
|
|
fire caulking- tyler Phone #: ###-#### 2.3 and 4th ceilling and fire stopping ok
|
BLD-Other | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | FAIL |
Jim Storey
|
|
|
Tyler-fire caulking for floors 4, 3 & 2 in the corridors Phone #: ###-####
|
BLD-Other | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | CANC |
Jim Storey
|
|
|
fire caulking insp on floors 4, 3, & 2 in the corridor // Tyler Higgins Phone #: ###-####
|
BLD-Other | 5/17/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Jim Storey
|
|
|
Partial fire caulking, 1st/laundry - Tyler Phone #: ###-#### ok to cover ceilling
|
BLD-Other | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Storey
|
|
|
fire colking..first floor // Tyler Phone #: ###-#### pool ok
|
BLD-Other | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Jim Storey
|
|
|
Pat--Partial fire caulking 1st floor Phone #: ###-#### lobby/breafast area and pool vesabul ceillings ok fire stopping complet
|
BLD-Other | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Jim Storey
|
|
|
fire colking Tyler Phone #: ###-####
|
BLD-Other | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | DEFR |
Jim Storey
|
|
|
fire colking Tyler Phone #: ###-####
|
BLD-Other | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | NR |
Jim Storey
|
|
|
Tyler Phone #: ###-####
|
BLD-Wall cover | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Jim Storey
|
|
|
for first floor guest rooms Tyler Phone #: ###-#### aso lobby walls and ceilling ok to cover.
|
BLD-Energy code compliance | 3/21/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Jim Storey
|
|
|
first floor
|
BLD-Energy code compliance | 3/20/2018 | 3/21/2018 | 3/21/2018 | P | NR |
Brandon Shaw
|
|
|
Tyler for first floor Phone #: ###-####
|
BLD-Other | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PART |
Jim Storey
|
|
|
fire caulk 1st fl guest rm - Tyler Phone #: ###-#### ok for frame/ ok to proceed with gyp and reinsp fire caulk
|
BLD-Other | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Jim Storey
|
|
|
2nd floor guest restroom // Tyler Phone #: ###-####
|
BLD-Other | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Jim Storey
|
|
|
fire caluking-tyloer Phone #: ###-#### 2nd floor chases ok to insulate and rc
|
BLD-Other | 2/22/2018 | 2/22/2018 | 2/22/2018 | P | PASS |
Jim Storey
|
|
|
Fire caulking - Tyler Phone #: ###-#### 3rd floor rooms/ east stair insulated ok to cover.
|
BLD-Energy code compliance | 2/21/2018 | 2/21/2018 | 2/22/2018 | P | PART |
Dave Hannah
|
|
|
3rd floor-Taylor Phone #: ###-#### insulation ok ok to cover
|
BLD-Other | 2/12/2018 | 2/12/2018 | 2/12/2018 | P | PASS |
Jim Storey
|
|
|
fire caulking 3rd floor gues rooms // Tyler Phone #: ###-####
|
BLD-Wall cover | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Jim Storey
|
|
|
part // Tyler Phone #: ###-#### 3rd floor ok to prerock all bath rooms
|
BLD-Other | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Jim Storey
|
|
|
Tyler-Partial fire caulking-4th floor guest restrooms Phone #: ###-#### ok and ceilling first floor ok to cover
|
FIRE-Sprinkler Rough-in | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspector sourced
colk // Tyler Phone #: ###-####
|
BLD-Other | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PART |
Jim Storey
|
|
|
10-20 grid line- fire caulking- Tyler Phone #: ###-#### can light gyp boxes ok need fire stopping/ oversized membrane penatrations need patch of gyp / fireblk plate hole/ fireproofing incapsilation of tube and beams.
|
BLD-Other | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PART |
Brandon Shaw
|
|
|
West half, 4th floor corridor- fire caulk
|
BLD-Other | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | FAIL |
Jim Storey
|
|
|
Fire colking ... 4th // Tyler Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PART |
Jim Storey
|
|
|
Tyler,-partial 2, 3, 4 floors Phone #: ###-#### rc ok // truss hanger // rat run// can light// ok to pre rock
|
BLD-Wall Bracing | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Jim Storey
|
|
|
Tyler Phone #: ###-####-partial wall bracing and frame on 2,3,and 4th foor pending rfi from egn. perfarated sheer ok or not
|
BLD-Energy code compliance | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Jim Storey
|
|
|
Tyler Phone #: ###-#### 2nd floor corridor ok
|
BLD-Energy code compliance | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | DEFR |
Jim Storey
|
|
|
Tyler Phone #: ###-#### out of time
|
BLD-Energy code compliance | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
Jim Storey
|
|
|
partial thermal insp for 3rd floor corridor // Tyler Phone #: ###-#### rockwool ok 4 th fl. rc and pre rock ok tubs and chase walls
|
BLD-Wall Bracing | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Dave Hannah
|
|
|
north exerior - tyler Phone #: ###-####
|
BLD-Wall Bracing | 12/26/2017 | 12/27/2017 | 12/27/2017 | A | PASS |
Jim Storey
|
|
|
Partial shear, West end exterior - Tyler Phone #: ###-#### west end ok to cover
|
BLD-Energy code compliance | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Jim Storey
|
|
|
Tyler Phone #: ###-#### r 30 ok at roof corridor
|
BLD-Framing/Rough-in | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PART |
Jim Storey
|
|
|
Tyler Phone #: ###-####corridor 2 thur 4 ok to gyp ceilling/ r 30 ok at roof
|
BLD-Wall cover | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Jim Storey
|
|
|
Tyler-partial bracing on east and south side Phone #: ###-####east and south side sheer ok to cover/ roof nailling ok/ pre rock ok to aply at tubs and hvac areas.
|
BLD-Ceiling Grid Inspection | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Jim Storey
|
|
|
Tyler-grid lines 12 thru 20 Phone #: ###-#### east and south side sheer ok to cover/ roof nailling ok/ pre rock ok to aply at tubs and hvac areas.
|
BLD-Other | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PASS |
Jim Storey
|
|
|
roof nailng-(grid lines 1-12 on roof) Bob Phone #: ###-#### west end
|
BLD-Other | 8/29/2017 | 8/30/2017 | 8/30/2017 | A | PASS |
Jim Storey
|
|
|
steal column- Bob Phone #: ###-####
|