FIRE-Final Inspection | 3/8/2018 | 3/9/2018 | 3/8/2018 | A | PASS |
Jim Page
|
|
|
Life fire safety inspection complete.
|
BLD-Final | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Aging Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/19/2017 | 12/19/2017 | 12/19/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 10/17/2017 | 10/18/2017 | 10/18/2017 | P | PART |
Dave Hannah
|
|
|
Inspection request is for the TCO. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok for temp occ ok for perm occ after bld final
|
FIRE-Final Inspection | 10/17/2017 | 10/18/2017 | 10/18/2017 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection for TCO complete, fire alarm inspection for TCO complete, commercial hood fire suppression system inspection for TCO complete, fire extinguishers are in place with a current inspection tags. TCO for life fire safety authorized for 90 days per conversation with Angela Brosious ###-####.
|
BLD-Other | 10/13/2017 | 10/16/2017 | 10/17/2017 | P | DONE |
Dave Hannah
|
|
|
Inspection request for the Temporary TCO for Monday and Tuesday Evening Friends and Family events. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok for events
|
BLD-Ceiling Grid Inspection | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Dave Hannah
|
|
|
Inspection request for ceiling grid inspection in the prep area of the Wylder restaurant as well as a soffit in the pump room of the Fowler. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
FIRE-Final Inspection | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | PART |
Jim Page
|
|
|
Partial final inspection complete for tenant space associated with this permit. As per signed TCO agreement, fire pump testing/commissioning is complete, tamper switch and flow switch testing is complete for levels 1 and 2 wet pipe fire sprinkler systems, tamper switch/pressure switch and high low air sensor testing complete for levels 1 and 2 dry pipe fire sprinkler systems, commercial hood fire suppression system inspection is complete (FIR permit for hood suppression system will remain in issued status until core and shell permits for building are complete and passed), fire sprinkler inspection complete for tenant space (FIR permit for fire sprinklers will remain in issued status until core and shell inspections are complete), fire alarm inspection complete for tenant space (FIR permit for fire alarms will remain in issued status until core and shell inspections are complete), fire extinguishers are in place with current inspection tags. Per note number 8 of the signed temporary occupancy plan no employees will be in the space except for the 2 owners and their executive chef until TCO is authorized.
|
BLD-Conference | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | DONE |
Dave Hannah
|
|
|
Inspection request for going through and walking through required interior signage for the Wylder TI restaurant. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Ceiling Grid Inspection | 8/11/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the Wood Ceiling Clouds Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
FIRE-Conference | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete, General Contractor will be sending a formal request to the fire code official for employee/owner TCO for pizza tenant.
|
BLD-Framing/Rough-in | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Metal Studs framing - Fire rated sheathing. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|