BLD-Final | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
Jim Sly
|
|
|
Contact with questions about the driveway, ACHD agreement in place - Randy Phone #: ###-####
|
DOC - Permit Finaled | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/5/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Brandon Shaw
|
|
|
Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Mike Jordan
|
|
|
Randy Phone #: ###-####. All framing issues have been corrected.
|
BLD-Framing/Rough-in | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | FAIL |
Mike Jordan
|
|
|
Randy Phone #: ###-####. Complete lateral bracing on AD01 mono trusses as shown on truss engineering. Install the straps for portal frames. Noted some areas wered exterior sheathing not attached. Correction notice poated.
|
BLD-Footing | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Mike Jordan
|
|
|
Randy Phone #: ###-####
|