BLD-Final | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Ceiling Grid Inspection | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PART |
Mike Jordan
|
|
|
west half // Tim Phone #: ###-####. West offices ok, pending fire sprinkler rough in inspection.
|
BLD-Ceiling Grid Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | DONE |
Mike Jordan
|
|
|
Please call ahead for access - Tim Phone #: ###-####. This portion of ceiling grid is existing.
|
BLD-Framing/Rough-in | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PASS |
Mike Jordan
|
|
|
Restroom framing and consult on draftstop - Tim Phone #: ###-####. Interior steel stud framed walls and hardlid for restroom.
|
BLD-Framing/Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PASS |
Mike Jordan
|
|
|
Offices - Tim Phone #: ###-####. Interior steel stud framed walls for conferance/offices and training rooms only. No grid.
|