BLD-Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Jim Storey
|
|
|
Please call Dutch 30 minutes prior to arrival thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon final ok wrong card need c.o. per plan reviewer insp. card and lc will not achive this requirment. 301
|
BLD-Final | 12/21/2018 | 12/24/2018 | 12/24/2018 | A | FAIL |
Jim Storey
|
|
|
Please call Dutch one hour prior to arrival Thank You Phone #: ###-#### Inspection requested via web by Dennis Harmon counter arch to resolve work space to not impeed with fire shudder/ need listing for 45 min door closers.
|
FIRE-Final Inspection | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Jim Page
|
|
|
Previously noted iyems have been corrected, final life fire safety inspection for area of work complete.
Have scheduled door company for a 1:00pm drop test on coil door if any questions please call Dutch @ 208 249 6313 Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon
|
BLD-Aging Inspection | 10/5/2018 | 10/5/2018 | 10/5/2018 | | PASS |
Jim Storey
|
|
|
5/23/2018 5/24/2018 5/24/2018 A FAIL
DetailsTroy Cobbley Repair main entrance exit discharge light, Provide panic hardware on door 111A, Provide listed smoke detectors, both sides, for release of door. See NFPA 72 17.7.5.6 for door 113A, Provide installation and testing of roll down fire door per NFPA 80, Provide exit sign/emergency llight and single action hardware at door 116A, Provide revised floor plans showing revised wall layout at doors 113A and 116A, Provide emergency lighting at interior west stairs as shown on the plans, Remove dead bolts from doors 119A, 119B and 115B, Provide racking permit for storage racks exceeding 8'-0" in height, Provide list of type/quantity of hazardous chemicals such as oil storage (new & waste), parts solvents, batteries...ect.
|
FIRE-Final Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | FAIL |
Troy Cobbley
|
|
|
Repair main entrance exit discharge light, Provide panic hardware on door 111A, Provide listed smoke detectors, both sides, for release of door. See NFPA 72 17.7.5.6 for door 113A, Provide installation and testing of roll down fire door per NFPA 80, Provide exit sign/emergency llight and single action hardware at door 116A, Provide revised floor plans showing revised wall layout at doors 113A and 116A, Provide emergency lighting at interior west stairs as shown on the plans, Remove dead bolts from doors 119A, 119B and 115B, Provide racking permit for storage racks exceeding 8'-0" in height, Provide list of type/quantity of hazardous chemicals such as oil storage (new & waste), parts solvents, batteries...ect.
please call Dutch @###-#### 1 hr before arrival, Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon
|
BLD-Framing/Rough-in | 2/25/2018 | 2/26/2018 | 2/26/2018 | A | PASS |
Jim Storey
|
|
|
Please call Dutch 1/2 hour prior to arrival thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon 2nd floor north end fire wall ch studs and core board ok fire stopping insided wall on shop side.
|
BLD-Conference | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | DONE |
Jim Storey
|
|
|
Please call Dutch 45 minutes prior to arrival thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon need info floor bearing on rated wall/ radted counter tag and listing/ girt and purlins fire stopping aproval// hvac protections// no spk hourly rating on wall .
|