BLD-Final | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | PASS |
Tony Young
|
|
|
Greg Phone #: ###-####,, wood added to guardrail to close openings to meet code now,, ok
|
DOC - Permit Finaled | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PEND |
Tony Young
|
|
|
Greg Phone #: ###-####
|
BLD-Final | 5/24/2017 | 5/24/2017 | 5/25/2017 | P | PART |
Tony Young
|
|
|
Greg Phone #: ###-####,, needs guardrail to meet code
|
BLD-Framing/Rough-in | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Tony Young
|
|
|
Deck framing for landing and stairs, on westside of existing house. 1" trek material will be applied to top and sides. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Footing | 5/1/2017 | 5/2/2017 | 5/3/2017 | P | PART |
Tony Young
|
|
|
Footings for deck landing Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Footing | 5/2/2017 | 5/2/2017 | 5/2/2017 | A | PART |
Tony Young
|
|
|
Footings for deck landing Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Framing/Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Brandon Shaw
|
|
|
Final on framing, corner wall/post. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Other | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Tony Young
|
|
|
Insulation installation. If you need to see insulation before drywall. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Footing | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Dave Hannah
|
|
|
New footing to level area where new sliding doors are being installed. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Framing/Rough-in | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Jim Sly
|
|
|
Rough in for everything except corner post, so i want to install insulation. Phone #: ###-#### Inspection requested via web by greg bauer Everyting except corner post and New Footing.
|
BLD-Conference | 3/22/2017 | 3/23/2017 | 3/23/2017 | P | PART |
Tony Young
|
|
|
Review framing at peck prior to collar tie installation Phone #: ###-#### Inspection requested via web by greg bauer,, wip
|
BLD-Conference | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PART |
Tony Young
|
|
|
Review framing at peck prior to collar tie installation Phone #: ###-#### Inspection requested via web by greg bauer/// work in progress,, ok,, engineer is watching also
|
BLD-Other | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PART |
Tony Young
|
|
|
Review framing at peck prior to collar tie installation Phone #: ###-#### Inspection requested via web by greg bauer//, work in progress,, opening up the roof area,, ok to procede
|
BLD-Conference | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PEND |
Tony Young
|
|
|
Review framing at peck prior to collar tie installation Phone #: ###-#### Inspection requested via web by greg bauer
|