DOC - Permit Finaled | | | 12/14/2018 | | DONE |
|
|
|
Per completed final inspections
|
BLD-Final | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
Aaron Phone #: ###-####
|
FIRE-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, previously noted items have been repaired, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection for area of work passed/complete.
|
BLD-Final | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | NR |
Mike Jordan
|
|
|
Aaron Phone #: ###-####. Still needs fire/life/safety reinspection. Contacted Aaron to let him know.
|
BLD-Final | 8/16/2017 | 8/17/2017 | 8/17/2017 | P | NR |
Dave Hannah
|
|
|
Sean Phone #: ###-#### need fire final first
|
FIRE-Final Inspection | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
|
FIRE-Final Inspection | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | FAIL |
Jim Page
|
|
|
Exit signs/emergency lighting need to be installed per city approved plans in area of work. Exit discharge egress lighting needs to be installed on south exterior exit in area of work.
|
FIRE-Final Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | CANC |
Troy Cobbley
|
|
|
No inspection performed. I need the project related fire alarm permit inspected/finaled prior to a life safety inspection.
Sharm Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/4/2017 | 8/7/2017 | 8/8/2017 | A | PART |
Brandon Shaw
|
|
|
Ceiling grid ok, need fire approval
|
BLD-Framing/Rough-in | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Jim Storey
|
|
|
Shawn Phone #: ###-#### beam at bar ok
|
BLD-Final | 5/11/2017 | 5/11/2017 | 5/11/2017 | A | NR |
Dave Hannah
|
|
|
|
BLD-Final | 5/10/2017 | 5/10/2017 | 5/11/2017 | P | NR |
Dave Hannah
|
|
|
|