BLD-Final | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Dave Hannah
|
|
|
Please call 30 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Michael Jerome
|
FIRE-Final Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Jim Page
|
|
|
Previously noted items have been repaired. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguisher, remove the thumbturn deadbolt from the west basement door and provide keyed on the egress side (remove thumbturn deadbolt) on the main entrance to the basement and provide sticker as discussed.
Mike Phone #: ###-####
|
BLD-Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | NR |
Jim Storey
|
|
|
Please call 30 minutes prior to allow the owners to open the property or I can be there to assist. Thanks Michael Phone #: ###-#### Inspection requested via web by Michael Jerome no mech permit/ no fire insp/ need pw insp.
|
BLD-Energy code compliance | 9/7/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Dave Hannah
|
|
|
Please call 30 minutes prior to the inspection to allow me to open the property. Phone #: ###-#### Inspection requested via web by Michael Jerome
|
BLD-Framing/Rough-in | 9/3/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Please call at least 30 minutes before the inspection to allow time to have the building open. Phone #: ###-#### Inspection requested via web by Michael Jerome
|