BLD-Final | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Jim Storey
|
|
|
Mark ###-####
|
DOC - Permit Finaled | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | NR |
Jim Storey
|
|
|
Mark--call 30 mins before, will need to pick up access card at front door Phone #: ###-#### ele pending
|
FIRE-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for scope of work complete.
Mark-please call 30 mins before Phone #: ###-####
|
FIRE-Final Inspection | 6/7/2018 | 6/8/2018 | 6/8/2018 | P | CANC |
Troy Cobbley
|
|
|
Mark Phone #: ###-####
|
FIRE-Conference | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | DONE |
Troy Cobbley
|
|
|
Mark and I discussed the security features on the new door in the exit corridor. I also discussed this with Carl Madsen in plan review. This door will need to meet all of the requirements in the IFC and IBC for Access Controled Egress Doors which includes the sensor. The Training Room needs two exits and this door causes issues with the secondary exiting from the Training Room per Carl. So plans will need to be re-submitted to plan review for possible approval of a different exiting system
|
FIRE-Conference | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete
|
FIRE-Conference | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | CANC |
Jim Page
|
|
|
Fire conference rescheduled for 17AUG2017, this request is cancelled.
|