Permit Information
Permit NumberBLD17-00669
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 8727 W ARDENE ST
Project NameGriffin Creek Bldg - Shell
Customer NumberESC17-00270
ePlanReviewYes
Description
(GRIFFIN CREEK OFFICE BUILDING – NEW BUILDING SHELL AND CORE – THREE TENANT SPACES) (DRH16-00398) This building does not have a fire sprinkler system. To construct a 5,165 square foot office building having 3 tenant spaces. Work is to include concrete footings, concrete foundations, concrete piers at perimeter columns, concrete slab on grade, tube steel columns, moment frames using wide flange beams and wide flange columns, glu-lam beams, steel roof deck, parapet braces, insulation installed on top of the roof deck, a single ply roofing membrane, primary and overflow roof drains, exterior steel stud walls with cavity and continuous insulation, 1-hr fire-resistance-rated West exterior wall and parapet due to proximity to the West property line, two uninsulated concrete exterior walls, an exterior steel awning at the building entry, exterior windows, exterior door, interior nonbearing walls, interior windows and doors, suspended acoustical ceiling, gypsum board ceilings, walnut wood ceiling, two shared toilet rooms accessible to the disabled, millwork, and finishes. Special Inspection is required for concrete, anchors post installed in hardened concrete, and structural steel (including bolting and welding). A trash enclosure will also be constructed under this permit. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit does not establish a Certificate of Occupancy for any portion of this building or for any tenant. A separate permit is required to establish a Certificate of Occupancy for each individual tenant. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/14/201711/14/201711/14/2017PPASS
DetailsMike Jordan
tyler Phone #: ###-####
DOC - Permit Finaled11/14/201711/14/201711/14/2017PPASS
DetailsMike Jordan
FIRE-Final Inspection11/14/201711/14/201711/14/2017PPASS
DetailsJim Page
Previously noted items have been repaired, final life fire safety inspection passed/complete.
FIRE-Final Inspection10/20/201710/20/201710/20/2017PFAIL
DetailsJim Page
Install addressing on exterior of building. In-duct detector needs to be tested for HVAC unti shutdown. Double key deadbolt with indicator or lever type door hardware needs to be installed in place of the thumbturn deadbolt assembly currently in place.
BLD-Ceiling Grid Inspection9/29/20179/29/20179/29/2017PPASS
DetailsMike Jordan
Quiten Phone #: ###-####
BLD-Framing/Rough-in8/28/20178/28/20178/28/2017PPASS
DetailsMike Jordan
John Phone #: ###-####
BLD-Energy code compliance8/28/20178/28/20178/28/2017PPASS
DetailsMike Jordan
John Phone #: ###-####
BLD-Framing/Rough-in8/23/20178/23/20178/23/2017PPASS
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud framed walls ok.
BLD-Framing/Rough-in8/15/20178/16/20178/16/2017APASS
DetailsMike Jordan
John Phone #: ###-####. Kickers on parapet.
BLD-Final8/10/20178/11/20178/11/2017ACANC
DetailsMike Jordan
roof deck & part seal-(later morning)John Phone #: ###-####
BLD-Framing/Rough-in8/11/20178/11/20178/11/2017APASS
DetailsMike Jordan
roof deck & part seal-(later morning)John Phone #: ###-####. Roof decking ok.
BLD-Other8/7/20178/7/20178/7/2017PPASS
DetailsMike Jordan
Steel and Glue beam- John Phone #: ###-####. Glue lam beams to column connections, Steel stud exterior walls and parapet.
BLD-Foundation7/6/20177/7/20177/7/2017PDEFR
DetailsMike Jordan
Rebar // Chet Phone #: ###-####. Special inspector on site. South stemwall and east concrete wall. Placement in progress when arrived on site.
BLD-Foundation6/29/20176/30/20176/30/2017APASS
DetailsMike Jordan
Concrete @8:30 - Chet Phone #: ###-####
BLD-Foundation6/28/20176/28/20176/28/2017PPART
DetailsMike Jordan
Rebar // John Phone #: ###-####. Interior column pad footings. work in progress on installing rebar mat for west concrete wall, interior form was in place.
BLD-Other6/27/20176/28/20176/28/2017APART
DetailsMike Jordan
exterior wall rebar // John Phone #: ###-####. Work in progress on constructiing rebar mats. Will place mat and form on one side then call for inspection prior to placing 2nd. form.
BLD-Foundation6/27/20176/27/20176/27/2017PDEFR
DetailsMike Jordan
Rebar ... pour at 2 // John Phone #: ###-####. Pending special inspection.
BLD-Foundation6/23/20176/26/20176/26/2017PPASS
DetailsMike Jordan
3pm concrete Rebar // Chett Phone #: ###-####. Perimeter footings ok.