Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD17-00747
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 3033 W ELDER ST
Project NameWells Fargo Chiller plant
Customer Number 
ePlanReviewYes
Description
(WELLS FARGO – CHILLER PLANT) Permit to demo the existing 945 sq. ft. enclosed chiller room and construct a new 1,368 sq. ft. open air chiller plant with an enclosed 37 sq. ft. rated fire riser room within the area at the west end of the existing building. Scope of work includes: removal of select concrete slab, removal of select walls, removal of select roof assembly, removal of select storefront window and infill with 8” CMU, construction of concrete footings, concrete slab, construction of CMU walls, construction of interior non-bearing steel stud rated walls and ceiling to create a fire riser room, new electrical, new plumbing work, new mechanical and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Note: Special Inspections Required see form 310. The building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/12/20193/12/20193/12/2019 DONE
DetailsJim Storey
DOC - Permit Finaled3/12/20193/12/20193/12/2019PPASS
DetailsJim Storey
FIRE-Final Inspection10/29/201810/29/201810/29/2018PPASS
DetailsTroy Cobbley
Life safety passed

Jade Phone #: ###-####
BLD-Aging Inspection9/21/20189/21/20189/21/2018 PASS
DetailsJim Storey
pending fire
FIRE-Final Inspection6/8/20186/8/20186/8/2018PCANC
DetailsTroy Cobbley
To be rescheduled per Jade until he can get pland and small documents on site.

Jade Conrad Phone #: ###-####
BLD-Aging Inspection5/10/20185/10/20185/10/2018 PASS
DetailsJim Storey
mec open wip
BLD-Aging Inspection12/27/201712/27/201712/27/2017 PASS
DetailsJim Storey
BLD-Framing/Rough-in8/14/20178/15/20178/15/2017APASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Foundation7/25/20177/27/20177/27/2017APASS
DetailsJim Storey
Kevin-rebar Phone #: ###-####
BLD-Footing7/10/20177/11/20177/11/2017PPASS
DetailsJim Storey
Kevin-footings and rebar Phone #: ###-####
BLD-Footing7/6/20177/7/20177/6/2017PCANC
DetailsJim Storey
footing rebar // Kevin Phone #: ###-#### Canceled Kevin called thursday 7-06-2017 at 11:23am.
BLD-Footing6/21/20176/22/20176/22/2017PPASS
DetailsJim Storey
Kevin Phone #: ###-#### si pending