Permit Information
Permit NumberBLD17-00926
StatusFinaled
Name EKC INC
Site Address 4125 S EAGLESON RD
Project NameHeartland Express
Customer Number 
ePlanReviewYes
Description
(HEARTLAND EXPRESS) Permit for the construction of a 4,639 sq. ft. addition to an existing 5,636 sq. ft. building. Work consists of new pre-engineered addition which will house an inspection pit and wash bay. Project includes demolition of an existing out building,a new site approach and new paving. The existing interior at the truck drivers lounge and office area will be remodeled as well. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/3/20181/4/20181/4/2018APASS
DetailsJim Storey
Dale Phone #: ###-####
FIRE-Final Inspection1/3/20181/4/20181/4/2018APASS
DetailsTroy Cobbley
Life safety passed. Per fire dept the second gate Opticon is functional.

Dale Phone #: ###-####
FIRE-Final Inspection12/28/201712/29/201712/29/2017PCANC
DetailsJim Page
Inspection request cancelled per conversation with Dale Phone #: ###-####, inspection request will be rescheduled for a later date.
BLD-Final12/28/201712/29/201712/29/2017PCANC
DetailsBrandon Shaw
Dale Phone #: ###-####
BLD-Final12/21/201712/22/201712/22/2017PFAIL
DetailsJim Storey
Dale Phone #: ###-#### need fire sign off
FIRE-Final Inspection12/21/201712/22/201712/22/2017PCANC
DetailsJim Page
South side gate opticon sensor tested okay with fire department, other gate was still being worked on, fire department was not able to test other sensor. Inspection request will need to be rescheduled when other sesnor can be tested. This inspection request is cancelled.
BLD-Final11/14/201711/15/201711/15/2017PPART
DetailsJim Storey
dale Phone #: ###-#### office/lounge only ok for temp.
FIRE-Final Inspection11/14/201711/15/201711/15/2017APART
DetailsTroy Cobbley
A temp for life safety is ok with Scott until both opticon systems at the two gates have been tested.

dale Phone #: ###-####
BLD-Framing/Rough-in9/26/20179/27/20179/27/2017APASS
DetailsJim Storey
metal framing // Dale Phone #: ###-####
BLD-Ceiling Grid Inspection9/15/20179/18/20179/18/2017APASS
DetailsJim Storey
Dale Phone #: ###-####
BLD-Framing/Rough-in8/10/20178/10/20178/10/2017PPASS
DetailsJim Storey
Dale Phone #: ###-#### trusses added per plan west of exstining bldg.
BLD-Footing8/3/20178/4/20178/4/2017APART
DetailsBrandon Shaw
9/10am-Dale Phone #: ###-####
BLD-Framing/Rough-in8/1/20178/2/20178/2/2017APASS
DetailsJim Storey
Dale Phone #: ###-#### pending trades
BLD-Other7/25/20177/26/20177/26/2017APASS
DetailsJim Storey
Dale-CMU Block Phone #: ###-####cmu and 3 hr wall progrestion of gyp ok to cover
BLD-Framing/Rough-in7/17/20177/17/20177/17/2017PPASS
DetailsJim Storey
coreboard in attic ok pending 5/8 layers
BLD-Framing/Rough-in7/17/20177/17/20177/17/2017PNH
DetailsJim Storey
dale Phone #: ###-####no access left message
BLD-Footing6/28/20176/29/20176/29/2017APART
DetailsBrandon Shaw
Dale Phone #: ###-####
Lower section of inspection pit
BLD-Footing6/22/20176/23/20176/23/2017APART
DetailsJim Storey
Dale-rebar Phone #: ###-####wip si on site