Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00980
StatusIssued
Name ESI
Site Address 701 E BOISE AVE
Project NameTimberline High Schoo Addition
Customer Number 
ePlanReviewYes
Description
(TIMBERLINE HIGH SCHOOL - ADDITION)**Project Management- Ron Hill** (EXPEDITE REVIEW) MODIFICATION #2 11/5/17 TO USE THE SPRAY ON OPTION ALREADY SHOWN IN THE UL ASSEMBLIES"" ""MODIFICATION TO ADD AN EJECTOR PUMP TO THE WASTE PLUMBIGN SYSTEM"" Permit for a 30,000 s.f. 2 story classroom addition and partial remodel to the existing 127,078 sq. ft. Timberline High School with work to include new openings between the new and existing construction interior select demolition of some classroom areas, general site work and construction of the new addition. This building is fully fire sprinklered for area increase and is alarmed. Any alterations to the sprinkler or alarm system shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/13/201812/13/201812/21/2018 CANC
DetailsJim Storey
BLD-Final7/26/20187/31/20187/31/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### final ok oupon all others that did not sign oc card.
FIRE-Final Inspection7/26/20187/30/20187/30/2018APART
DetailsJim Page
Partial life fire safety inspection complete, fire sprinkler inspection complete, fire alarm inspection for addition is complete (fire alarm permit is for a complete fire alarm upgrade for the whole school, fire alarms are active through school and new addition, TCO is authorized for 60 days per conversation with Ron Johnson, when FIR permit for fire alarms is finaled then life fire safety for this permit can be finaled), fire exitnguishers are in place with current inspection tags. TCO authorized for 60 days contingent on the fire alarm panel upgrade being completed.

Kevin Phone #: ###-####
BLD-Other7/24/20187/25/20187/25/2018PPASS
DetailsJim Storey
Kevin-Ceiling cover Phone #: ###-####
BLD-Framing/Rough-in7/2/20187/3/20187/3/2018APART
DetailsDave Hannah
Daniel Phone #: ###-#### ok to cover specal ed area
BLD-Framing/Rough-in6/18/20186/19/20186/19/2018APASS
DetailsJim Storey
Ken Phone #: ###-#### 2nd floor link.
BLD-Aging Inspection6/12/20186/12/20186/12/2018 PASS
DetailsJim Storey
BLD-Ceiling Grid Inspection3/29/20183/30/20183/30/2018APASS
DetailsJim Storey
Kent Phone #: ###-####-first floor ceilling ok
BLD-Ceiling Grid Inspection3/28/20183/29/20183/29/2018PCANC
DetailsJim Storey
Kent-first floor Phone #: ###-####
BLD-Ceiling Grid Inspection3/14/20183/15/20183/15/2018APASS
DetailsJim Storey
Phone #: 2089723063 >> Inspection requested via mobile web by Kevin Antonucci
BLD-Conference2/22/20182/23/20182/23/2018PPASS
DetailsJim Storey
Phone #: 2089723063 >> Inspection requested via mobile web by Kevin Antonucci hard lids ok to cover.
BLD-Energy code compliance1/26/20181/29/20181/29/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####1st and 2nd
BLD-Framing/Rough-in1/17/20181/18/20181/18/2018ACANC
DetailsMike Jordan
Second level - Andrew Phone #: ###-####
BLD-Energy code compliance1/18/20181/18/20181/18/2018APASS
DetailsMike Jordan
Second level - Andrew Phone #: ###-####. 2nd. floor exterior walls only. No stairwells at this time.
BLD-Framing/Rough-in1/12/20181/16/20181/16/2018ACANC
DetailsJim Storey
Second floor // Kevin Phone #: ###-#### PER ANDREW VIA EMAIL (BLH)
BLD-Framing/Rough-in12/13/201712/13/201712/13/2017PPASS
DetailsJim Storey
Russell Phone #: ###-#### 2nd floor fireprooffing ok framing ok trade work in progess.
BLD-Framing/Rough-in11/14/201711/15/201711/16/2017PPART
DetailsJim Storey
Russel Phone #: ###-#### exterior walls ok pending fireprooffing exterior beams ok to sheet.
BLD-Framing/Rough-in11/8/201711/13/201711/13/2017APASS
DetailsJim Storey
Kevin Phone #: ###-#### exterior wall framing in progress// ok for pannel mock up north east corner.
BLD-Framing/Rough-in10/27/201710/30/201710/30/2017APASS
DetailsJim Storey
Kevin Phone #: ###-#### roof paripet framing ok/ need r 28 for roof deck insulation.