Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD17-01128
StatusFinaled
Name DEBELLOY CONSTRUCTION
Site Address 6438 S SUPPLY WAY
Project NameSealmaster TI
Customer Number 
ePlanReviewYes
Description
(SEALMASTER) **(05/31/17 PLAN MODIFICATION TO ADD OVERHEAD DOOR, NEW DRINKING FOUNTAIN LOCATION. JAR) **Permit is to remodel an existing 4,920 sq. ft. office/warehouse space to create retail space within the existing office for new tenant. This permit is approved contingent upon adhering to the approved plans on file. Work to include: demo existing nonbearing interior walls; construction of new ADA compliant service counter; addition of ADA compliant drinking fountain. Interior finishes must be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/14/20179/14/20179/15/2017PPASS
DetailsJim Storey
Josh Phone #: ###-#### final ok no card on site
BLD-Final7/20/20177/20/20177/20/2017PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by kevin debelloy need racking permit/ door hardware 2 nd floor/ back handrail if on plan set
FIRE-Final Inspection7/17/20177/17/20177/17/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, final life fire safety inspection passed/complete
FIRE-Final Inspection6/19/20176/19/20176/19/2017AFAIL
DetailsJim Page
Modifications need to be made to the fire sprinkler system to accomodate newly added equipment and roll up overhead door along the north wall. Storage racks exceed 8 feet in height, a racking permit is required for storage that exceeds 8 feet or the storage and racking needs to be lowered below 8 feet to the top of storage.
BLD-Framing/Rough-in5/8/20175/9/20175/9/2017APASS
DetailsJim Storey
please call Shay at ###-#### 30 minutes before arrival to gain access if you could . Phone #: ###-#### Inspection requested via web by kevin debelloy