BLD-Final | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Dave Hannah
|
|
|
The basement electrical was tied to the Diablo ; Sons permit which is why we requested a temp occupancy for the basement. Now that the electrical has been signed off under building permit BLD17-02185 for Diablo ; Sons we can now final out and close the basement permit. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
|
BLD-Aging Inspection | 10/26/2018 | 10/26/2018 | 11/2/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 8/6/2018 | 8/7/2018 | 8/7/2018 | P | PART |
Dave Hannah
|
|
|
Dale Phone #: ###-#### ok for temp occ down stiars
|
FIRE-Final Inspection | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Dale Phone #: ###-####
|
FIRE-Final Inspection | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | FAIL |
Jim Page
|
|
|
Repair or replace exit sign that is hanging by its wires.
Dale Phone #: ###-####
|
BLD-Framing/Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon McCurdy basement ok to cover
|
BLD-Other | 12/19/2017 | 12/19/2017 | 12/20/2017 | P | PART |
Dave Hannah
|
|
|
Fire/Life Safety has signed off. We are ready for a temp occupancy inspection for use of the Basement Prep Rm. All other trade inspections (i.e. Plumbing ; Electrical) have pass and granted tempCofO''s. Phone #: ###-#### Inspection requested via web by Brandon McCurdy ok for temp occ on food prep area in basemnt
|
BLD-Other | 12/19/2017 | 12/20/2017 | 12/19/2017 | A | CANC |
Dave Hannah
|
|
|
We are ready for a temp occupancy inspection to seek permission to occupy/use the Basement Prep Room. The Fire/Life Safety re-inspection is schedule for Tuesday PM. All of trade inspections (i.e. Plumbing & Electrical) have passed and temp occupancies have been granted. Thanks. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
|
FIRE-Final Inspection | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | PART |
Jim Page
|
|
|
Fire sprinkler work complete for TCO requested area, fire extinguishers are in place with current inspection tags. Life fire safety inspection for TCO requested area (Prep litchen, coolers and corridor basement level) complete.
|
BLD-Other | 12/19/2017 | 12/20/2017 | 12/19/2017 | P | CANC |
Dave Hannah
|
|
|
We are ready to have temporary occupancy request inspection to obtain permission to use the Basement Prep Room. The Fire/Life Safety re-inspection is schedule for Wednesday AM. All other trade inspection (i.e. Plumbing & Electrical) have granted temp occupancies. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
|
FIRE-Final Inspection | 12/19/2017 | 12/20/2017 | 12/19/2017 | A | CANC |
Jim Page
|
|
|
We are ready for a re-inspection for Fire/Life Safety to obtain a temporary occupancy for the basement Prep Room. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
|
BLD-Conference | 12/15/2017 | 12/15/2017 | 12/16/2017 | P | PASS |
Dave Hannah
|
|
|
We need to review a new sprinkler main that has to be installed below 6''8". Theoretically the new line falls outside of the proposed path of egress as indicated on the plans. However, to play it safe, Bruce Poe (Architect) wanted me to have you take a look at it before we get too carried away. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
|
BLD-Conference | 12/13/2017 | 12/14/2017 | 12/14/2017 | P | CANC |
Dave Hannah
|
|
|
We are schedule to have out Fire Life Safety and Fire Sprinkler inspections during the morning. I''m hoping to be granted a TCO for the Basement Prep Rm. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
|
FIRE-Conference | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | FAIL |
Jim Page
|
|
|
Path of egress is more than what was shown on the proposed TCO plan submitted to Jason Blais, coolers are being used so corridor from coolers to stairs is to be included for egress purposes, fire sprinklers will need to be added to basement corridor before TCO can be approved for life fire safety. Sheetrock will need to be installed on corridor wall to seperate area still under construction (area of seperation is where the fire sprinkler system is impaired) from the noted path of egress before TCO can be approved for life fire safety. A fire watch will be required for area's where the fire sprinkler system has been impaired while building is occupied or active fire sprinkler protection will need to be put in the area where the sprinkler piping was removed before TCO can be approved for life fire safety. TCO required items have been discussed with Scott Arellano and Ron Johnson and they are in aggreement for the items mentioned to be completed before TCO can be approved for requested areas.
|
BLD-Conference | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | DONE |
Dave Hannah
|
|
|
Anytime after 9:30 am. Please call me first as the Architect wants to walk the site with us. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
|