BLD-Final | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Final | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | CANC |
Dave Hannah
|
|
|
Brad Wheeler Phone #: ###-####
|
BLD-Final | 5/2/2018 | 5/2/2018 | 5/3/2018 | P | PEND |
Dave Hannah
|
|
|
Call to meet // Rod Phone #: ###-#### needs flood plan cert and ada signage
|
FIRE-Final Inspection | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire exitinguisher will be placed in discussed location. Final lilfe fire safety inspection complete.
|
BLD-Framing/Rough-in | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Concrete | 11/27/2017 | 11/28/2017 | 12/5/2017 | A | DONE |
Dave Hannah
|
|
|
rebar- Brad Phone #: ###-####
|
BLD-Other | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Dave Hannah
|
|
|
Masonary wall - Brad Phone #: ###-#### ok after mti sign off
|
BLD-Other | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Dave Hannah
|
|
|
rebar // Brad Wheeler Phone #: ###-####
|