FIRE-Final Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | FAIL |
Adele J Schaffeld-Griffin
|
|
|
I delevered approved drawing to owner Tobe, fire extinguisher needs to be installed, handrails need to be installed per approved plans.
|
FIRE-Final Inspection | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | FAIL |
Jim Page
|
|
|
Building owners name is Toby, Toby was not available at time of inspection, no approved plans on site, life fire safety inspection was not performed. Business is being conducted at this location.
|
BLD-Final | 3/6/2018 | 3/7/2018 | 3/7/2018 | P | PEND |
Dave Hannah
|
|
|
Electrical permit finaled. Final if bld provisions completed needs fire life saftey first
|
BLD-Conference | 1/10/2018 | 2/8/2018 | 2/20/2018 | A | PEND |
Dave Hannah
|
|
|
Status? Issue 5 day N&O no notice issued talked with elec inspector he is working with elec contractor on elec
|
BLD-Other | 11/20/2017 | 11/28/2017 | 11/29/2017 | A | DONE |
Dave Hannah
|
|
|
Check status of work? no work done
|