BLD-Final | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | PASS |
Brandon Shaw
|
|
|
Abel Phone #: ###-####
|
DOC - Permit Finaled | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Jim Storey
|
|
|
Abel Phone #: ###-#### pending others
|
BLD-Final | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PART |
Jim Storey
|
|
|
Abel Phone #: ###-#### temp ok pending trades
|
FIRE-Final Inspection | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete (Mag locks for tenant space release on general fire alarm), fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work passed/complete.
|
BLD-Final | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | NR |
Jim Storey
|
|
|
Able Phone #: ###-####
|
FIRE-Final Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled. Need to repair the two exit signs and provide two exit signs in the Break Room. Need panic hardware installed in Break Room. Need additional emergency lighting in the Open Office area. Need fire extinguishers provided.
|
BLD-Ceiling Grid Inspection | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Jim Storey
|
|
|
Abel-would like as late as possible Phone #: ###-####
|
BLD-Framing/Rough-in | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | PART |
Jim Storey
|
|
|
Abel Phone #: ###-####walls ok except for plm hole in floor firestopping re insp.
|
BLD-Framing/Rough-in | 5/30/2017 | 5/31/2017 | 5/31/2017 | A | PART |
Brandon Shaw
|
|
|
Able Phone #: ###-#### Phase II A, framing, OK to insulate/cover
|