BLD-Aging Inspection | 1/23/2018 | 1/23/2018 | 1/24/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PASS |
Dave Hannah
|
|
|
Todd-contractor Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####,, frame and soffit ok to cover
|
BLD-Other | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | NR |
Brandon Shaw
|
|
|
Soffit, pre plans pg A 5.0, detail 7- One hour can assambly required.
|
BLD-Wall cover | 8/18/2017 | 8/21/2017 | 8/21/2017 | A | NR |
Brandon Shaw
|
|
|
Need Electrical rough in, verify can assm .are fire rated
|
BLD-Framing/Rough-in | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, mainly a frame/WUI conference,, work in progress
|
BLD-Foundation | 7/13/2017 | 7/14/2017 | 7/14/2017 | P | PART |
Tony Young
|
|
|
Rebar // Doug Phone #: ###-####,, ok pending special inspection reports
|
BLD-Footing | 7/7/2017 | 7/7/2017 | 7/7/2017 | P | DONE |
Tony Young
|
|
|
Todd Phone #: ###-####,, 301 looked at it,, soils has been approved
|
BLD-Foundation | 7/5/2017 | 7/6/2017 | 7/6/2017 | P | FAIL |
Jim Storey
|
|
|
Rebar... late afternoon // Todd Phone #: ###-#### need pw sign off/ si for 3500 psi testing.
|