BLD-Final | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Greg Phone #: ###-####
|
BLD-Final | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PART |
Jim Sly
|
|
|
Greg Phone #: ###-#### Phase 1 ......OK.
|
FIRE-Final Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PART |
Troy Cobbley
|
|
|
Phase 1 area life safety passed.
Greg Phone #: ###-####
|
FIRE-Conference | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | DONE |
Troy Cobbley
|
|
|
We discussed life safety requirements. I noted that the wrong remote annunciator had been installed for the duct smoke detector and that the exit discharge light was missing at the west exit door.
Greg Phone #: ###-####
|
BLD-Other | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Jim Sly
|
|
|
Tbar grid - Greg Phone #: ###-####
|
BLD-Energy code compliance | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Jim Sly
|
|
|
Jeff-Ceiling Rough Framing Phone #: ###-#### Inspection requested via web by Jeff Canning
|
BLD-Other | 12/29/2017 | 1/2/2018 | 1/2/2018 | P | DONE |
Jim Sly
|
|
|
Jeff-CMU inspection Phone #: ###-#### CMU Completed. OK pending all inspections, tests and approval by Geotek.
|
BLD-Other | 12/26/2017 | 12/27/2017 | 12/27/2017 | A | PASS |
Jim Sly
|
|
|
cmu inspection // Jeff Phone #: ###-#### CMU final lift OK pending Geotek special inspection, tests and approvals.
|
BLD-Footing | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-#### OK pending Geotek special inspection, tests and approvals.
|