BLD-Final | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Ok for perm. occ. No electrical work done due to change in scope of work. Existing restrooms were able to remain.
|
FIRE-Final Inspection | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | DONE |
Troy Cobbley
|
|
|
We discussed the need for panic hardware on the west exit door, removing the exit sign and blocking the northexit door and providing keyed hardware on the main exit and providing additional emergency lighting.
|
BLD-Conference | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | DONE |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Needs to provide drinking fountain, move toilet and sink in existing bathrooms and add correct grab bars. Needs life/safety final.
|
BLD-Conference | 8/2/2017 | 8/3/2017 | 8/3/2017 | P | DONE |
Mike Jordan
|
|
|
call when on way // Scott Martin Phone #: ###-####. Architect will need to submit plan mod to modify scope of work to lave existing bathrooms and show that existing restrooms will meet ADA.
|
BLD-Framing/Rough-in | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. framing for new overhead door ok.
|