BLD-Final | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Storey
|
|
|
ELE Final Scheduled for 8-24-17 PM// Gabe Phone #: ###-#### ramp and stairs ok pending ele-9/18/17 as per Jim Storey ok for perm c of o
|
FIRE-Final Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, fire alarm inspection complete, fire extinguisjers are in place with current inspection tags (fire extinguisher inspection tags expire at the end of August) Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | CANC |
Jim Page
|
|
|
Project has an attached FIR permit in issued status, fire alarm inspection needs to be complete and passed before life fire safety inspection can be performed. This inspection request is cancelled.
|
FIRE-Final Inspection | 8/19/2017 | 8/21/2017 | 8/21/2017 | A | CANC |
Jim Page
|
|
|
Project hasan attached FIR permit in issued status, fire inspection needs to be complete and passed before life fire saety inspection can be performed. This inspection request is cancelled.
|
BLD-Framing/Rough-in | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PASS |
Jim Storey
|
|
|
Gabe Phone #: ###-####
|