BLD-Final | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50-3.05
|
BLD-Final | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | CANC |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Other | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | PART |
Dave Hannah
|
|
|
sofit // Rolo Phone #: ###-#### work in progress looks ok
|
BLD-Energy code compliance | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Jim Storey
|
|
|
Rollo Phone #: ###-#### framing c/n made ok insulation ok to cover
|
BLD-Framing/Rough-in | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Brandon Shaw
|
|
|
Pending Engineer approval for A-2 truss splinting and nailing
OK to insulate
|
BLD-Wall Bracing | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | PASS |
Brandon Shaw
|
|
|
Shear // Rolo Phone #: ###-####
|
BLD-Foundation | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Brandon Shaw
|
|
|
Early PM, Please - Dion Phone #: ###-####
|