DOC - Permit Finaled | | | 5/23/2019 | | DONE |
|
|
|
passed final on 5-21-2019
|
BLD-Final | 5/20/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Tony Young
|
|
|
Re inspection Phone #: ###-#### Inspection requested via web by Josh Strasser,, received letter from engineer,, ok
|
BLD-Final | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PART |
Tony Young
|
|
|
I will be on site today Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending final okay letter from engineer
|
BLD-Wall Bracing | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Sly
|
|
|
Sheer inspection Area D Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Wall cover | 1/18/2019 | 1/22/2019 | 1/22/2019 | P | DEFR |
Dave Hannah
|
|
|
Sheer inspection Area D Phone #: ###-#### Inspection requested via web by Josh Strasser out of time
|
BLD-Framing/Rough-in | 1/15/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Tony Young
|
|
|
Area D to the Left of Rite Aid. Final area of the Northgate Remodel. Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Framing/Rough-in | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | NR |
Tony Young
|
|
|
Area D to the Left of Rite Aid. Final area of the Northgate Remodel. Phone #: ###-#### Inspection requested via web by Josh Strasser,, needs trades 1st,, fire and electrical
|
BLD-Framing/Rough-in | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | PART |
Tony Young
|
|
|
Partial Sheer framing rough in Area E (Rite Aid) Phone #: ###-#### Inspection requested via web by Josh Strasser,, nailing ok
|
BLD-Wall Bracing | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | PART |
Tony Young
|
|
|
Sheer Partial Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress,, rite aid section,, ok
|
BLD-Wall Bracing | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PART |
Brandon Shaw
|
|
|
Partial strapping and clips to sheet walls
|
BLD-Wall Bracing | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Jim Storey
|
|
|
Partial Roof cover and wall cover to get water tight in the area from above. Phone #: ###-#### Inspection requested via web by Josh Strasser stud framing ok at roof rafters and bearing walls w/sheer clips per plan// 18x24 plate steel to cmu wall rfi as to two difernent bolt sizes not on plan need verrifacation as built is ok
|
BLD-Aging Inspection | 11/21/2018 | 11/21/2018 | 11/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/20/2018 | 11/20/2018 | 11/26/2018 | | CANC |
Tony Young
|
|
|
|
BLD-Wall cover | 7/9/2018 | 7/9/2018 | 7/9/2018 | A | PART |
Tony Young
|
|
|
Area F Front of Goodwill Shear for Cover Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok after renailing some areas of face and soffit,, see paint notes
|
BLD-Wall cover | 7/2/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Tony Young
|
|
|
Sheer inspection Area F and G Josh Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok after re-doing a few areas
|
BLD-Framing/Rough-in | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | PART |
Tony Young
|
|
|
Theater Breezeway Shear to Metro PCS. Framing and Rough in Front of Goodwill Phone #: ###-#### Inspection requested via web by Josh Strasser,, see paint notes
|
BLD-Wall cover | 6/5/2018 | 6/6/2018 | 6/10/2018 | P | PASS |
Tony Young
|
|
|
Area F,G,H Approve for cover Area I Shear Nail Approve for cover Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Wall Bracing | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Tony Young
|
|
|
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser,,
|
BLD-Wall Bracing | 5/14/2018 | 5/14/2018 | 5/15/2018 | P | PART |
Tony Young
|
|
|
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress
|
BLD-Wall Bracing | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | DEFR |
Tony Young
|
|
|
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Wall cover | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | NR |
Tony Young
|
|
|
Area K Sheer Liquor store area Phone #: ###-#### Inspection requested via web by Josh Strasser,, need to re-do some areas,,
|
BLD-Framing/Rough-in | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PART |
Tony Young
|
|
|
Area J and K From Liquor Store to Mongolian Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending trades
|
BLD-Wall cover | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PART |
Tony Young
|
|
|
Sheer inspection Area C early PM if possible Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress,, re-nail some areas,, needs 3/8" on sides
|
BLD-Wall Bracing | 4/5/2018 | 4/6/2018 | 4/9/2018 | P | PASS |
Tony Young
|
|
|
Partial Area C Reinspect sheer partial Area C Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Framing/Rough-in | 4/4/2018 | 4/5/2018 | 4/5/2018 | P | PART |
Tony Young
|
|
|
Partial Area C Reinspect sheer partial Area C Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, work in progress,, needs sprinklers passed
|
BLD-Wall Bracing | 4/3/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Tony Young
|
|
|
Partial Area C Sheer Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Wall cover | 4/2/2018 | 4/3/2018 | 4/3/2018 | P | PART |
Tony Young
|
|
|
Partial Area C Sheer Phone #: ###-#### Inspection requested via web by Josh Strasser// work in progress,, needs some intermediate nailing/screws
|
BLD-Framing/Rough-in | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PART |
Jim Sly
|
|
|
Partial Area C Phone #: ###-#### Inspection requested via web by Josh Strasser Area C OK.
|
BLD-Framing/Rough-in | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PART |
Tony Young
|
|
|
Partial for Area A and west side of Area B Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, ok pending trades in this area,, by vape
|
BLD-Framing/Rough-in | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PART |
Tony Young
|
|
|
Partial for Area A and west side of Area B Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, need more screws,, also trades
|
BLD-Wall Bracing | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PART |
Tony Young
|
|
|
Partial A Wall sheeting for cover Phone #: ###-#### Inspection requested via web by Josh Strasser,, late am,, fasteners ok per ICC report,, shear ok to cover
|
BLD-Wall cover | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | NR |
Tony Young
|
|
|
Partial A Wall sheeting for cover Phone #: ###-#### Inspection requested via web by Josh Strasser,, need to redo per plan,, need equivalent for the fasteners
|
BLD-Framing/Rough-in | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Tony Young
|
|
|
Partial Area A for cover. Late PM Phone #: ###-#### Inspection requested via web by Josh Strasser,, west end of Area A ok
|
BLD-Wall Bracing | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PART |
Tony Young
|
|
|
Partial for roof sheathing. Josh Strasser Phone #: ###-#### Inspection requested via web by Josh Strasser,, frame members ok above Sallys and Weightwatchers
|
BLD-Foundation | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Mike Jordan
|
|
|
Pouring 3 Piers at 1:15 PM I pier in front of the gold store 1 pier front of old hall mark 1 pier in front of old blockbuster Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD-Footing | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PART |
Brandon Shaw
|
|
|
7 Footings 3 Piers Area A and C
|
BLD-Footing | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Strasser Strata OK'd sub grade......STRATA inspecting rebar.....1st 5 footing pads starting from West end.
|