BLD-Ceiling Grid Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jim Sly
|
|
|
Call half before // Dan Phone #: ###-#### Should have been a Final FINAL PASS
|
DOC - Permit Finaled | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PEND |
Mike Jordan
|
|
|
Please call contractor when on way, if possible. Phone #: ###-#### Inspection requested via web by Dan Beck. Needs blowwer door test, and plumbing final(trim piece for tub on order). Everything else ok.
|
BLD-Final | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 6/18/2018 | 6/20/2018 | 6/20/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Beck
|
BLD-Energy code compliance | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Brandon Shaw
|
|
|
30 mins ahead- Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Jim Sly
|
|
|
call when on way to meet// Dan Phone #: ###-#### Frame and Shear........OK.
|
BLD-Foundation | 8/13/2017 | 8/14/2017 | 8/14/2017 | A | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 8/10/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Conference | 8/10/2017 | 8/11/2017 | 8/10/2017 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Inspection cancelled via mobile web on Thursday, August 10, 2017.
|
BLD-Footing | 8/6/2017 | 8/7/2017 | 8/7/2017 | A | NR |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo . No one on site. footings not yet excavated.
|
BLD-Footing | 11/20/2017 | 11/20/2017 | | P | |
|
|
|
###-#### - Heron
|