BLD-Framing/Rough-in | 12/20/2017 | 12/22/2017 | 12/22/2017 | A | PASS |
Tony Young
|
|
|
Doug Phone #: ###-####,, insulation ok,, ok to cover
|
BLD-Framing/Rough-in | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Tony Young
|
|
|
Russel Phone #: ###-####,, new engineering ok
|
BLD-Wall Bracing | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | FAIL |
Brandon Shaw
|
|
|
Not as per plans, submit revised engineering for back garage wall, window openings added.
|
BLD-Foundation | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Footing | 10/6/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Brandon Shaw
|
|
|
Jim-as early as possible please Phone #: ###-####. Informed contractor he could proceed with concrete placement and to leave stringlines in place. Geotech letter received/approved by PW.
|
BLD-Footing | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | NR |
Jim Storey
|
|
|
Doug Cobb Phone #: ###-#### need pw signoff
|
BLD-Footing | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | CANC |
Brandon Shaw
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|