FIRE-Final Inspection | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with poiunt of contact.
Dillon Phone #: ###-####
|
BLD-Final | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Jim Storey
|
|
|
no card on site
|
BLD-Final | 10/7/2019 | 10/9/2019 | 10/9/2019 | P | PART |
Jim Storey
|
|
|
Dillion Phone #: ###-#### si and engineer signoff records on thumb drive with planreview// all c/n idems complet/ pending panic hardware at ion-chromatograph rm h4 occ.
|
BLD-Final | 9/19/2019 | 9/23/2019 | 9/23/2019 | A | PART |
Jim Storey
|
|
|
Dillon Phone #: ###-#### pipe smoke seal at link/ remove exit sign at stair/ gaurdrailling required on stair/ engineerring to aprove tank bolting to meet siezmic
|
BLD-Final | 8/16/2019 | 8/19/2019 | 8/21/2019 | P | FAIL |
Jim Storey
|
|
|
Dillon Phone #: ###-#### 1 cn on building 39 and 1 c/n on tressel.
|
FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.
dillon Phone #: ###-####
|
FIRE-Final Inspection | 8/1/2019 | 8/5/2019 | 8/5/2019 | A | FAIL |
Jim Page
|
|
|
Provide city approved drawings as well as small documents from building permit fire code review.
Dillon Phone #: ###-####
|
BLD-Aging Inspection | 6/5/2019 | 6/5/2019 | 6/5/2019 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Other | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | PASS |
Jim Storey
|
|
|
For Ken Johnson, Firewall inspection. Phone #: ###-#### Inspection requested via web by Joel Hartman north membrane ok.
|
BLD-Wall cover | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | FAIL |
Jim Storey
|
|
|
Inspect beams and columns for drywall and screw patterns before taping, for Forte. Requested by Ken Johnson Phone #: ###-#### Inspection requested via web by Joel Hartman// provide ul listing for col and beam wrap framing and screw requirments. beam over 24 inches deep/ col screw over 12 oc.
|
BLD-Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | | PASS |
Jim Storey
|
|
|
work in progress
|
BLD-Other | 11/5/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Jim Storey
|
|
|
Brian Smith with YMC is requesting a fire caulking inspection tomorrow at 1:00 PM. For contact please see attached cell number. Phone #: ###-#### Inspection requested via web by Joel Hartman// chilled h2o and gycole fire stopping west end of fire wall ok.
|
BLD-Other | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Jim Storey
|
|
|
Fire caulking around 32" pipes GL-9. Contact will be Mike Glasgow, phone number above. Phone #: ###-#### Inspection requested via web by Joel Hartmanpipes fire backing ok pending 1/4 chalking.
|
BLD-Conference | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PART |
Jim Storey
|
|
|
Jim, I set this up for Greg, he asked if you would give him a call when you got here. ###-#### Phone #: ###-#### Inspection requested via web by Joel Hartman hillti to revise listing for clearity of applacation.
|
BLD-Other | 8/3/2018 | 8/3/2018 | 8/3/2018 | A | FAIL |
Jim Storey
|
|
|
added to previous c/n membrane penatration at struc colums/continuity of fire wall not complet end to end//duct and piping thur pentrations unprotected.
|
BLD-Ceiling Grid Inspection | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hartman need access to vreify thru penatrations above ceilling grid//missing primitor clips at ele rm hall side.
|
BLD-Aging Inspection | 6/29/2018 | 6/29/2018 | 7/5/2018 | | PASS |
Jim Storey
|
|
|
wip no insp
|
BLD-Framing/Rough-in | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | PART |
Jim Storey
|
|
|
Ken Phone #: ###-#### rated wall center of building wip gyp screw pick up base plate/butts/ ele back to back need fire stopping
|
BLD-Framing/Rough-in | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Jim Storey
|
|
|
Ken Phone #: ###-#### exterior framing ok/ interior framing wip
|
BLD-Framing/Rough-in | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | DEFR |
Jim Storey
|
|
|
Ken Phone #: ###-#### out of time
|
BLD-Framing/Rough-in | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PART |
Jim Storey
|
|
|
Ken Phone #: ###-#### west and north exterior walls ok //center 2hr framing wip
|
BLD-Framing/Rough-in | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PART |
Jim Storey
|
|
|
Ken Phone #: ###-#### neast end interior stud to track missig
|
BLD-Other | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | CANC |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | DEFR |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 12/26/2017 | 12/27/2017 | 12/27/2017 | A | PASS |
Jim Storey
|
|
|
Ken Phone #: ###-#### exterior wall east side/ south half ok clips and stud framing
|
BLD-Framing/Rough-in | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PASS |
Jim Storey
|
|
|
Ken Phone #: ###-#### west wall ok center to the south
|
BLD-Framing/Rough-in | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | PART |
Jim Storey
|
|
|
###-#### Ken all screws and clips ok to cover// missing base track stud screws thruout.
|
BLD-Foundation | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PART |
Jim Storey
|
|
|
north wall joel rebar nor instaled corect being fixed to be verified by si
|
BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Jim Storey
|
|
|
Ken Phone #: ###-#### east wall framing ok to cover.
|
BLD-Framing/Rough-in | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PART |
Jim Storey
|
|
|
Ken Phone #: ###-#### reviewed clips and screws missing some noted and being pick up at this time south wall ok to cover
|
BLD-Framing/Rough-in | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PART |
Jim Storey
|
|
|
Ken Phone #: ###-#### area a west wall stud framing/ need info of knock out height from bearing at bottom/ all clips ans screws ok to cover
|
BLD-Footing | 9/15/2017 | 9/18/2017 | 9/18/2017 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hartman rebar in progress si pending s 11 to sf
|
BLD-Other | 9/13/2017 | 9/14/2017 | 9/14/2017 | P | CANC |
Jim Storey
|
|
|
rebar // Shane Brandon Phone #: ###-####
|