BLD-Final | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | PASS |
Tony Young
|
|
|
Vedad Phone #: ###-####
|
DOC - Permit Finaled | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | FAIL |
Mike Jordan
|
|
|
Vedad---Please call 30 mins before Phone #: ###-####. Needs to provide guard at west side of house at retaining wall. Provide blower door test result and post.
|
BLD-Ceiling Grid Inspection | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | PEND |
Tony Young
|
|
|
Call for access // Vedad Phone #: ###-####,, ceiling insulation,, just need to see the insulation self certification sticker at the final
|
BLD-Ceiling Grid Inspection | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | DEFR |
Jim Storey
|
|
|
Call for access // Vedad Phone #: ###-#### to tony am tue
|
BLD-Wall cover | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Tony Young
|
|
|
Vedad Phone #: ###-####
|
BLD-Wall cover | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | NR |
Tony Young
|
|
|
Vedad Phone #: ###-####,, need to replace missing insulation where it has blown out and need to build chases
|
BLD-Energy code compliance | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PART |
Tony Young
|
|
|
Vedad Phone #: ###-####,, replace blown out insulation,, fire block new chases when they are built
|
BLD-Framing/Rough-in | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | PASS |
Tony Young
|
|
|
Call half hour before to meet /// Vedad Phone #: ###-####
|
BLD-Wall Bracing | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | FAIL |
Brandon Shaw
|
|
|
Need revised Engineering- stem wall was wrong height, builder cut approx 12" off stem wall elevation. No hold downs in place at time of inspection
|
BLD-Foundation | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo ,, work in progress
|
BLD-Footing | 9/18/2017 | 9/19/2017 | 9/19/2017 | P | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo ,, work in progress
|