BLD-Final | 12/20/2017 | 12/20/2017 | 12/21/2017 | P | PASS |
Dave Hannah
|
|
|
No need to go out (ok for temp occ needs alarm finals Per david h 12/1/17) (alarm passed) just need a pass
|
FIRE-Final Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Jim Page
|
|
|
Fire alarm modifications/inspection complete, final life fire safety inspection for areas of work complete.
|
BLD-Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | P | PART |
Dave Hannah
|
|
|
Greg Phone #: ###-#### ok for temp occ needs alarm finals
|
FIRE-Final Inspection | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags, fire alarm modifications are required and will be installed under FIR17-00702, TCO for life fire safety is authorized for 30 days per conversation with Scott Arellano pending fire alarm inspection when work is completed.
|
BLD-Final | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | NR |
Tony Young
|
|
|
Greg Phone #: ###-####,, needs others 1st
|
FIRE-Final Inspection | 11/22/2017 | 11/27/2017 | 11/27/2017 | A | FAIL |
Jim Page
|
|
|
Provide fire alarm modifications to accommodate remodelled areas.
|
BLD-Final | 11/22/2017 | 11/27/2017 | 11/27/2017 | P | CANC |
Tony Young
|
|
|
CANC PER Greg on 11-27-17 Phone #: ###-####
|
BLD-Conference | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | DONE |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 | P | PASS |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | FAIL |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
BLD-Other | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | CANC |
Dave Hannah
|
|
|
sound insulation // Greg Olsen Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | PART |
Tony Young
|
|
|
Greg Phone #: ###-####,, walls ok
|