Permit Information
Permit NumberBLD17-02170
StatusFinaled
Name STROTH GENERAL
Site Address 511 W BROAD ST
Project NameForm & Function Coffee Shop
Customer Number 
ePlanReviewYes
Description
(FORM & FUNCTION COFFEE SHOP – FOWLER BUILDING – 1ST STORY – NORTHWEST CORNER) The fire sprinkler system is used for story and area increase and as required by the “Special Design Standards for Type V Construction” as adopted by the City of Boise. Early start permit BLD17-02617 was issued to do under slab plumbing work. A separate plumbing permit was required. To prepare an existing 1,308 square foot shell space to be used as a coffee shop. A 409 square foot open mezzanine will be constructed. After the mezzanine is constructed, the total floor area of this tenant space will be about 1,659 square feet (1,250 square feet 1st story and 409 square feet 1st story mezzanine – 58 square feet of the stairway was not included). No more than 25% of the total seating within this tenant space is allowed to be on the mezzanine. The mezzanine construction includes concrete footings, steel stud bearing and shear walls with gypsum board sheathing, shear wall hold-downs, steel beams attached to existing concrete columns, steel floor joists, and a concrete floor on top of a steel deck. The mezzanine floor is required to have a 2-hr fire-resistance-rating. Columns, beams connected directly to columns, and bearing walls supporting the mezzanine are required to have a 3-hr fire-resistance-rating. The mezzanine was designed for a 100 psf live load. The mezzanine will be served by a stairway having steel stringers and steel treads. Special Inspection is required for anchors post installed in hardened concrete (including epoxy, screw, and expansion anchors) and for spray applied fire proofing. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/13/20183/13/20183/13/2018PPASS
DetailsDave Hannah
Dave, this needs finaled now that the shell and core is done so they can have permanent occupancy. Let me know if there are any problems. Thanks, Angie Brosious ###-####.
FIRE-Final Inspection3/13/20183/13/20183/13/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
BLD-Aging Inspection2/14/20182/14/20182/20/2018 PEND
DetailsDave Hannah
BLD-Final12/6/201712/7/201712/7/2017APART
DetailsDave Hannah
WIll Phone #: ###-#### ok for temp occ ok for perm after bldg is signed off and other trades go perm and rest room sinks are finished
FIRE-Final Inspection12/6/201712/7/201712/7/2017APART
DetailsJim Page
Fire sprinkler inspection for area of work complete, fire alarm inspection for area of work complete, fire extinguishers are mounted with current inspection tags. Final life fire safety complete for area of work. Tenant space will remain in TCO status until core and shell is complete and finaled. Tenant space can be finaled when core and shell is complete and finaled.
BLD-Conference12/6/201712/6/201712/7/2017PDONE
DetailsDave Hannah
Will Phone #: ###-####
BLD-Conference12/5/201712/5/201712/5/2017PDONE
DetailsDave Hannah
Will Phone #: ###-####
FIRE-Conference12/4/201712/5/201712/5/2017ADONE
DetailsJim Page
Fire conference complete.
BLD-Framing/Rough-in11/16/201711/17/201711/17/2017APASS
DetailsDave Hannah
rick Phone #: ###-####
BLD-Framing/Rough-in11/8/201711/9/201711/17/2017APEND
DetailsDave Hannah
Rick Phone #: ###-#### need engineering
BLD-Energy code compliance11/15/201711/15/201711/15/2017APASS
DetailsDave Hannah
perimeter insulation // Rick ###-####
BLD-Framing/Rough-in11/13/201711/13/201711/15/2017PPART
DetailsDave Hannah
Rick Phone #: ###-#### need engineering on beam to beam conections the rest is ok
BLD-Energy code compliance11/13/201711/13/201711/15/2017PCANC
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Other11/14/201711/14/201711/15/2017PCANC
DetailsDave Hannah
perimeter insulation // Rick ###-####
BLD-Framing/Rough-in11/8/201711/8/201711/9/2017PPART
DetailsDave Hannah
Rick Phone #: ###-#### ok to inasulate ext walls need engineer to look at beam to beam connections and beam to coulmn connections
BLD-Framing/Rough-in10/3/201710/4/201710/4/2017APART
DetailsDave Hannah
Will Phone #: ###-#### ok to cover upper ceiling area