Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD17-02341
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 3003 W MAIN ST Unit: STE 110
Project NameDeliberate Directions Ste 110
Customer Number 
ePlanReviewYes
Description
(DELIBERATE DIRECTIONS – SUITE #110) Permit for new 1,738 sq. ft. business use tenant in a vacant shell space. Approval is contingent upon adhering to the approved plans on file. Work to include: new concrete slab, new construction of interior non-bearing walls to create (3) offices, a conference room, hallways and a reception area, new door/door frames, millwork, interior windows, select new suspended acoustic ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/17/201710/18/201710/18/2017APASS
DetailsDave Hannah
Please call 30min prior for access - Jamie Phone #: ###-####
BLD-Final10/12/201710/12/201710/12/2017PPEND
DetailsDave Hannah
Please contact Jamie 30 min prior for access please
###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy ok for tco ok for perm after they finish installing glass
FIRE-Final Inspection10/11/201710/12/201710/12/2017APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is in place with a current nispection tag. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection9/27/20179/27/20179/27/2017PPASS
DetailsJim Sly
please call 30 min prior / Jamie Phone #: ###-####
BLD-Framing/Rough-in8/25/20178/25/20178/25/2017PPASS
DetailsDave Hannah
As late as possible and call half hour before to meet // Jamie Phone #: ###-#### ok to cover after plumbing rough in