Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-02419
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 1285 S BIRD ST
Project NameCimarron Apartments
Customer NumberBLD17-02410 - BLD17-02429
ePlanReviewNo
Description
(CIMARRON APARTMENTS 4-PLEX) (20 PERMITS FILED UNDER BLD17-02410 IN EPLANREVIEW)(DRH17-00144) **Permit for the construction of a 20 multi-family buildings consisting of 80 units total in (1) six-plex, (1) duplex, and (18) four-plexes. All buildings are reviewed under the IBC and are required to be fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/27/20186/27/20186/27/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection6/26/20186/27/20186/27/2018APASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by David Scaggs
FIRE-Final Inspection6/25/20186/25/20186/25/2018PFAIL
DetailsJim Page
Only 1 smoke detector in the unit 102 would sound when test buttons was pushed, smoke detectors in the units all need to sound when smoke detection audible is activated.

Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Final6/25/20186/25/20186/25/2018PNR
DetailsMike Jordan
Fire Final called in for PM as well. Phone #: ###-#### Inspection requested via web by David Scaggs. Needs fire/life/safety fialfirst.
FIRE-Final Inspection6/22/20186/22/20186/22/2018PFAIL
DetailsTroy Cobbley
102 smoke alarms did not ring back. 104 head under stairs issue.

Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Energy code compliance3/9/20183/9/20183/9/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Framing/Rough-in3/6/20183/6/20183/6/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Wall Bracing2/28/20182/28/20182/28/2018APASS
DetailsMike Jordan
Inspection requested via web by Marty Short
BLD-Footing1/15/20181/16/20181/16/2018APASS
DetailsMike Jordan
Interior footings, concrete scheduled for 10am Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Energy code compliance1/1/20181/2/20181/2/2018APART
DetailsMike Jordan
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short. Noted to contractor that prior to backfill operations, areas to be backfilled must be free of snow and ice and not be frozen. Baclfill materials also to not be frozen.
BLD-Foundation12/26/201712/27/201712/27/2017PPASS
DetailsMike Jordan
Concrete scheduled for 1pm Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Footing12/20/201712/21/201712/21/2017PPASS
DetailsMike Jordan
Concrete scheduled for 2pm Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Footing12/17/201712/18/201712/18/2017ACANC
DetailsMike Jordan
Concrete scheduled for 12pm Phone #: ###-#### Inspection requested via web by Marty Short