BLD-Final | 12/26/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Mike Jordan
|
|
|
Door glass installed. Phone #: ###-#### Inspection requested via web by Mark Steen. Ok for perm occ.
|
BLD-Final | 12/11/2017 | 12/12/2017 | 12/12/2017 | P | PART |
Mike Jordan
|
|
|
Troy to re-inspect doors and lights in the AM for fire life safety final, will pass the word whether we pass or fail. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen. Ok for temp occ. nneds to install tempered glazing in doors and provide transition from offices.
|
FIRE-Final Inspection | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | P | NR |
Jim Sly
|
|
|
Please note that a re-inspection for life safety was requested for AM. Also note that final electrical is scheduled for AM. Also refer to BLD17-00763 which is the same building and is also a PM Final. Allowing one visit on two Finals. Thanks, Mark Steen Phone #: ###-#### Inspection requested via web by Mark Steen Need fire final.......shell/core finaled.
|
FIRE-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final. Will be rescheduled for tuesday
Please note that a call to Carl Westfall about the door egress issue is awaiting a reply. Also The Exit Discharge lights will not be on the timer system any longer. Thanks, Mark Steen Phone #: ###-#### Inspection requested via web by Mark Steen
|
FIRE-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide correct hardware on all exit doors as discussed or provide plan review approval that they can be turned into windows by having hardware and exit signs removed. Exit discharge lights appear to be on a timer which is not allowed. provide missing exit sign at the north east exit door
|
BLD-Framing/Rough-in | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Mike Jordan
|
|
|
Follow up, see notes from previous Insp of Oct 27. Thanks, Mark Steen Phone #: ###-#### Inspection requested via web by Kareen Falls. All trades have signed off.
|
BLD-Framing/Rough-in | 10/26/2017 | 10/27/2017 | 10/30/2017 | P | PART |
Brandon Shaw
|
|
|
OK to cover one side, pending other trades
|