BLD-Final | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call Bryan at 208.286.8679. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Call Bryan at ###-####. Needed to see straps at garage doors. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Wall cover | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Call Bryan at ###-####. Detached garage..should be ready to cover after framing pass. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Wall Bracing | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Brandon Shaw
|
|
|
See detail for PHF- 2"x2" washer, straps at header, 3"x3" nailing at header
|
BLD-Foundation | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Framing/Rough-in | 12/14/2017 | 12/15/2017 | 12/14/2017 | A | CANC |
Brandon Shaw
|
|
|
Please reference engineer compliance letter. Thanks Bryan Phone #: ###-#### >> Inspection requested via web by Bryan Mogel Inspection cancelled from web by: Bryan Mogel
|
BLD-Wall Bracing | 12/14/2017 | 12/15/2017 | 12/14/2017 | A | CANC |
Brandon Shaw
|
|
|
Please reference engineer compliance letter. Thanks Bryan Phone #: ###-#### >> Inspection requested via web by Bryan Mogel Inspection cancelled from web by: Bryan Mogel
|