BLD-Final | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Mike Jordan
|
|
|
Steven Phone #: ###-####. two of the units installed new handrails at stairs and need to comply with current code, they do not. Other four units ok.
|
FIRE-Final Inspection | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Steven Phone #: ###-####
|
BLD-Final | 2/12/2018 | 2/13/2018 | 2/13/2018 | P | NR |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
FIRE-Final Inspection | 2/12/2018 | 2/13/2018 | 2/13/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide two additional fire extinguishers as discussed and relocated the new smoke alarms to atleast 3'-0" from the air diffusers and restroom doors.
Steve Phone #: ###-####
|
BLD-Final | 2/9/2018 | 2/12/2018 | 2/12/2018 | P | NR |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Needs fire/life/safety final
|
BLD-Energy code compliance | 10/25/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Conference | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### remove vents from common wall
|
BLD-Wall Bracing | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | PART |
Jim Storey
|
|
|
Shear // Steve Phone #: ###-#### conf let in bracing ok to orig. const.
|
BLD-Conference | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | DONE |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Went over 1hr. fire wall construction and smoke alarms.
|