BLD-Final | 12/14/2018 | 12/14/2018 | 12/16/2018 | P | PASS |
Tony Young
|
|
|
Luff Phone #: ###-####
|
DOC - Permit Finaled | 12/16/2018 | 12/16/2018 | 12/16/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 12/13/2018 | 12/14/2018 | 12/16/2018 | A | PASS |
Tony Young
|
|
|
Luff Phone #: ###-####// 2.
|
BLD-Final | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Tony Young
|
|
|
Luff Phone #: ###-####
|
BLD-Blower Door Test Results | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | NR |
Tony Young
|
|
|
Luff Phone #: ###-####
|
BLD-Final | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | NR |
Tony Young
|
|
|
Luff Phone #: ###-####
|
BLD-Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | NR |
Tony Young
|
|
|
Luff Phone #: ###-####,, needs trades
|
BLD - Request for Extension | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Tony Young
|
|
|
Cameron Phone #: ###-####
|
BLD-Energy code compliance | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Call to meet // Cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT.
|
BLD-Framing/Rough-in | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | FAIL |
Mike Jordan
|
|
|
Cameron-call 30 mins ahead Phone #: ###-####. Provide truss engineering. Nail off all hangars. Fireblock upstairs at tub at ceiling. Provide engineering for cut LVL on back porch. Ok to insulate. Correction notice issued.
|
BLD-Wall Bracing | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PART |
Jim Sly
|
|
|
shear // Cameron Phone #: ###-#### Exterior nailing and 4 STHD 14 hold downs at front of house......OK. did not verify other types of Hd s.......(if any) check at frame. OK to wrap.
|
BLD-Footing | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Brandon Shaw
|
|
|
Jared Phone #: ###-####
|