BLD-Final | 6/18/2018 | 6/19/2018 | 6/20/2018 | A | PART |
Dave Hannah
|
|
|
Tom--late morning is best Phone #: ###-#### ok for tco needs to fix gaurd rail ada hardware on sliding door plumbing co
|
FIRE-Final Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by south entry. Final life fire safety inspection complete.
Call to meet // Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PEND |
Dave Hannah
|
|
|
Call to meet there // Jake Phone #: ###-#### ok to cover after other trades ok rough ins
|