BLD-Final | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Tell Riley
|
|
|
Bob Phone #: ###-####//undersink padding added//final complete//no signature card//
|
BLD-Final | 12/2/2019 | 12/4/2019 | 12/4/2019 | P | NR |
Tell Riley
|
|
|
Chit Phone #: ###-####//need to add sink drain cover per description on two bathrooms//
|
FIRE-Final Inspection | 10/22/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not provided at time of inspection.
jEREMY Phone #: ###-####
|
BLD-Final | 7/31/2019 | 8/1/2019 | 7/31/2019 | A | CANC |
Tell Riley
|
|
|
Chip Moved From Weds--###-####//fist thing if possible//cancel per Chip//
|
FIRE-Final Inspection | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | FAIL |
Troy Cobbley
|
|
|
Still need some of the exit signs and emergency lights repaired. Also need a FIR permit for the duct detector and mag lock interface.
CHIP Phone #: ###-####
|
BLD-Final | 7/31/2019 | 7/31/2019 | 7/31/2019 | A | CANC |
Tell Riley
|
|
|
Chip Moved From Weds--###-####//fist thing if possible//
|
BLD-Final | 7/26/2019 | 7/31/2019 | 7/31/2019 | A | CANC |
Tell Riley
|
|
|
Please call Chip when on your way to inspection. Phone #: ###-#### Inspection requested via web by Robert Hunter
|
FIRE-Final Inspection | 12/6/2018 | 12/10/2018 | 12/10/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide testing of all exit signs and emergency lights, provide interconnection of the door mag and the fire alarm system as discussed and as IFC chapter 10, Provide verification/testing of the duct smoke detector and the new 6 ton hvac unit
Call ahead to meet // Chip Phone #: ###-####
|