Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD17-03168
StatusFinaled
Name VISSER BUILDING CO
Site Address 9950 W USTICK RD
Project NameFaith Community Bible Church
Customer Number 
ePlanReviewYes
Description
(FAITH COMMUNITY BIBLE CHURCH) Permit is to remodel an existing 28,214 sq. ft. assembly church building (previously occupied by “New Heights Christian Fellowship” under BLD95-00427 and BLD02-00155). Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of platform side stairs, construction of select interior non-bearing walls to partition the 1st and 2nd grade classrooms, to partition with an accordion wall the toddler and Kindergarten room, select wall infill, adding vertical grab bars at the men’s/women’s restrooms and adding insulated covers to exposed pipes under sinks, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered on the existing north addition side only. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/201912/20/201912/20/2019APASS
DetailsTell Riley
Bob Phone #: ###-####//undersink padding added//final complete//no signature card//
BLD-Final12/2/201912/4/201912/4/2019PNR
DetailsTell Riley
Chit Phone #: ###-####//need to add sink drain cover per description on two bathrooms//
FIRE-Final Inspection10/22/201910/25/201910/25/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not provided at time of inspection.

jEREMY Phone #: ###-####
BLD-Final7/31/20198/1/20197/31/2019ACANC
DetailsTell Riley
Chip Moved From Weds--###-####//fist thing if possible//cancel per Chip//
FIRE-Final Inspection7/31/20197/31/20197/31/2019PFAIL
DetailsTroy Cobbley
Still need some of the exit signs and emergency lights repaired. Also need a FIR permit for the duct detector and mag lock interface.

CHIP Phone #: ###-####
BLD-Final7/31/20197/31/20197/31/2019ACANC
DetailsTell Riley
Chip Moved From Weds--###-####//fist thing if possible//
BLD-Final7/26/20197/31/20197/31/2019ACANC
DetailsTell Riley
Please call Chip when on your way to inspection. Phone #: ###-#### Inspection requested via web by Robert Hunter
FIRE-Final Inspection12/6/201812/10/201812/10/2018PFAIL
DetailsTroy Cobbley
Provide testing of all exit signs and emergency lights, provide interconnection of the door mag and the fire alarm system as discussed and as IFC chapter 10, Provide verification/testing of the duct smoke detector and the new 6 ton hvac unit