BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/6/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 9/28/2017 | 9/29/2017 | 10/2/2017 | P | PASS |
Brandon Shaw
|
|
|
would like earlier if poss, please call to arrang time // John Magnan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2017 | 9/29/2017 | 10/2/2017 | P | PASS |
Brandon Shaw
|
|
|
would like earlier if poss, please call to arrang time // John Magnan Phone #: ###-####
|
BLD-Conference | 9/14/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####-please call 15 minutes prior to meet
|