BLD-Final | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.8
|
BLD-Blower Door Test Results | 6/8/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Final | 6/8/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Final | 5/8/2018 | 5/10/2018 | 5/10/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 5/10/2018 | 5/10/2018 | 5/10/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50 4.6
|
BLD-Energy code compliance | 2/19/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/15/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Brandon Shaw
|
|
|
Shear // Ever Phone #: ###-####
|
BLD-Foundation | 12/4/2017 | 12/5/2017 | 12/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/30/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|