Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD17-03312
StatusFinaled
Name TIMBER AND LOVE INC
Site Address 2008 S TRAVERTINE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
HILLSIDE AND FOOTHILLS - NO EXTERIOR WORK BEYOND ADDING A DOOR IS PROPOSED. Permit to remodel interior of home. Removing one existing Bedroom to provide large Master Closet. Basement to have existing space to become Office (cannot be a sleeping room since it does not meet escape and rescue requirements), Remodeling existing Bathroom, adding wall with transom windows between Family Room and new Office, adding closet and linen. Main floor; removing wall between Kitchen and Living Room (replacing with engineered beam), remodeling Kitchen and Dining Room, adding sliding glass door to Dining, filling in existing door at Kitchen, turning an existing Bedroom into a large Mst Closet, updating fixtures in Mst. Bath and Guest Bath. No exterior work beyond the sliding glass door is proposed. All work to be done according to plans, notes, review notes and local codes. Separate electrical, mechanical and plumbing permits are required. No additional square footage is to be added. Carbon monoxide and smoke detectors to be updated as required. **BJM**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/14/20182/15/20182/15/2018APASS
DetailsDave Hannah
call 15 mins ahead- Jessica Phone #: ###-####
DOC - Permit Finaled2/15/20182/15/20182/15/2018PPASS
DetailsDave Hannah
BLD-Final1/29/20181/30/20181/31/2018PPEND
DetailsDave Hannah
Call half hour before to meet // Jessica Phone #: ###-#### needs to hard wire smoke and co2 detectors
BLD-Final1/25/20181/25/20181/26/2018PNH
DetailsDave Hannah
Call 15 mins ahead for access- Jessica Phone #: ###-#### (any building questions call Clint ###-####
BLD-Framing/Rough-in11/1/201711/1/201711/1/2017PPASS
DetailsDave Hannah
call 10 mins ahead- Zach Phone #: ###-####
BLD-Framing/Rough-in10/23/201710/24/201710/24/2017PFAIL
DetailsDave Hannah
Rock Phone #: ###-#### needs plumbing r/i and engineering on ceiling joist connection to beam that was cut back to far