BLD-Blower Door Test Results | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
4.5
|
DOC - Permit Finaled | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
DOC - Permit Finaled | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 3/2/2018 | 3/2/2018 | 3/4/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Framing/Rough-in | 3/1/2018 | 3/1/2018 | 3/1/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart,, see paint,, straps, toenails,, ok to insulate
|
BLD-Wall Bracing | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Tony Young
|
|
|
Shea // jorge Phone #: ###-####
|
BLD-Footing | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-#### Soil test done by All West testing and Engineering. Approved for pour. In addition ......Contractor widened footings from 16" to 18". and added 2 rows #4 horizontal rebars in footing.
|
BLD-Conference | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,, soils report?
|
BLD-Conference | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | NR |
Tony Young
|
|
|
Pat Phone #: ###-####,, soils report?
|
BLD-Footing | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,, need an ok for the soils as built,, loose sand in some areas
|
BLD-Footing | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | NR |
Tony Young
|
|
|
Pat Phone #: ###-####,, correction notice posted,, need soils report due to debris and loose soils
|