BLD-Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
DOC - Permit Finaled | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 5/17/2018 | 5/18/2018 | 5/17/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Weston Wagner Inspection cancelled from web by: Weston Wagner
|
BLD-Other | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | PASS |
Brandon Shaw
|
|
|
soffit // rolo Phone #: ###-####
|
BLD-Other | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | FAIL |
Brandon Shaw
|
|
|
Seams and joints need to be tighten up or fire caulked Not complete
|
BLD-Energy code compliance | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Energy code compliance | 2/16/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Brandon Shaw
|
|
|
Shear corrections and revised Engineering- SAT
|
BLD-Framing/Rough-in | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice Need revised Engineering
|
BLD-Wall Bracing | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice
|
BLD-Foundation | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Thermal protection required
|
BLD-Footing | 12/4/2017 | 12/5/2017 | 12/5/2017 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|