DOC - Permit Finaled | | | 11/12/2019 | | DONE |
|
|
|
Per BLD Final Inspection on 9/4/19
|
BLD-Final | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | DONE |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Tony Young
|
|
|
Gim Phone #: ###-####
|
BLD-Blower Door Test Results | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | DONE |
Tony Young
|
|
|
Tim Phone #: ###-####/// 1.6
|
BLD-Final | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | NR |
Tony Young
|
|
|
Gim Phone #: ###-####
|
BLD-Final | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | FAIL |
Tony Young
|
|
|
Call to meet // Tim Phone #: ###-####,, c/n posted,, guardrail openings, firewall, smoke detector, blower door test, address posted visible from Twilight, window fall protection, plans, etc
|
BLD-Other | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | DONE |
Tony Young
|
|
|
check on soffits,, not called in for inspection,, ok,, verified sheetrock
|
BLD-Other | 6/3/2019 | 6/4/2019 | 6/10/2019 | A | DEFR |
Tony Young
|
|
|
need to check on soffits,, not called in for inspection
|
BLD-Aging Inspection | 5/30/2019 | 5/30/2019 | 6/5/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | NR |
Tony Young
|
|
|
Tim Phone #: ###-####,, still needing plate lines sealed up
|
BLD-Framing/Rough-in | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, need to seal plate lines,, maintain fire blocking
|
BLD-Other | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, soffit work in progress,, ok
|
BLD-Framing/Rough-in | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, needs fire blocking, seal plates.. nail hangers off,, ok to insulate
|
BLD-Foundation | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PART |
Tony Young
|
|
|
Need a wall rebar inspection. Phone #: ###-#### Inspection requested via web by Tim Nau, ok to pour/grout walls after completing the rebar
|
BLD-Footing | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Nau,, garage footing
|
BLD-Footing | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PEND |
Tony Young
|
|
|
Need inspection on garage footing. MTI performed soil inspection and compaction tests. Hoping to pour at 3pm. Thanks Phone #: ###-#### Inspection requested via web by Tim Nau/// needs soils approval
|
BLD-Foundation | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PART |
Tony Young
|
|
|
Trying to pour at 10:15. Had inspection set up for last Friday afternoon and this may be a follow up inspection from that. Phone #: ###-#### Inspection requested via web by Tim Nau,, work in progress,, ok
|
BLD-Foundation | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, work in progress on main house walls
|
BLD-Foundation | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | CANC |
Tony Young
|
|
|
Looking for the latest inspection we can possibly get this afternoon in preparation for a Monday morning pour. Thanks Phone #: ###-#### >> Inspection requested via web by Tim Nau Inspection cancelled from web by: Tim Nau
|
BLD-Foundation | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PART |
Tony Young
|
|
|
Requesting concrete retaining wall inspection. Phone #: ###-#### Inspection requested via web by Tim Nau,, work in progress,, back retaining wall at the back of the basement,, front stairway to the house walls
|
BLD-Footing | 4/27/2018 | 4/27/2018 | 4/30/2018 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, stair footings,, fcs blocks
|
BLD-Footing | 4/18/2018 | 4/19/2018 | 4/19/2018 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, upper basement footings ok
|