BLD-Blower Door Test Results | 7/16/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 5.0
|
BLD-Final | 7/16/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 5/16/2018 | 5/16/2018 | 5/17/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Framing/Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs to be installed per Manuf. recommendation. Interior shear walls need edges blocked and nailing, as per plans.
OK to insulate
|
BLD-Other | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Brandon Shaw
|
|
|
soffit-fire rating, Ever Phone #: ###-####
|
BLD-Wall Bracing | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PART |
Brandon Shaw
|
|
|
Hold downs and straps to be installed before framing rough in.
|