Permit Information
Permit NumberBLD17-03435
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 4095 S GEKELER LN
Project NameAce Co
Customer Number 
ePlanReviewYes
Description
(ACE CO) //Plan modification to adjust the new equipment enclosure footprint to the west and increase the size of the new enclosure, to make new equipment enclosure taller in height, to raise the roof in height of the new equipment cover, to remove existing rear window and infill. 5-10-2018 JG// The fire sprinklers used for area. Permit for a 1,040 sq. ft. addition to an existing 22,760 sq. ft. manufacturing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select exterior bearing walls, removal of select roof and wall infill at the south/west corner, removal of select concrete slab, construction of a new 720 sq. ft. pre-engineered metal building, construction of a new 364 sq. ft. pre-engineered metal cover, relocation of equipment, some minor site work, new concrete slab and footings, (2) new ADA accessible parking spaces, electrical work, plumbing work and mechanical work. Note: special inspection is required, see form #310 attached. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  7/27/2018 DONE
BLD-Final7/26/20187/26/20187/26/2018PPASS
DetailsDave Hannah
Nate Phone #: ###-####
FIRE-Final Inspection7/24/20187/24/20187/24/2018PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.

Nate Phone #: ###-####
BLD-Conference5/22/20185/23/20185/23/2018APASS
DetailsJim Storey
Nate Phone #: ###-#### stairlanding and main accessable entry same componit cross slopr ok at stair 2%.