BLD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Jim Sly
|
|
|
Contacts are either Don Rye or Jay Hintze Phone #: ###-#### Inspection requested via web by Scott Campbell
|
DOC - Permit Finaled | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
|
BLD-Framing/Rough-in | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PASS |
Jim Sly
|
|
|
- Duke Phone #: ###-####
|
BLD-Wall Bracing | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PASS |
Jim Sly
|
|
|
shear- Duke Phone #: ###-####
|
BLD-Conference | 1/22/2018 | 1/22/2018 | 1/23/2018 | P | DONE |
Jim Sly
|
|
|
Duke Phone #: ###-####
|
BLD-Other | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Jim Sly
|
|
|
Hole - Duke Phone #: ###-#### Holes for P/T 6x8 columns.
|
BLD-Conference | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | DONE |
Jim Sly
|
|
|
btwn 8-10 // Duke Phone #: ###-####
|