Permit Information
Permit NumberBLD17-03632
StatusFinaled
Name STEED CONSTRUCTION
Site Address 555 S COLE RD
Project NameLocker Room Addition
Customer Number 
ePlanReviewYes
Description
(INTERMOUNTAIN GAS – LOCKER ROOM ADDITION TO THE WELDING SHOP – NORTH SIDE) (DRH17-00258) This building does not have a fire sprinkler system. To construct a new 265 square foot toilet room, shower room, and locker room addition to an existing 2,450 square foot building used as a welding shop and storage room. After the addition, this building will have a total floor area of about 2,715 square feet. Work is to include concrete footings, concrete foundations, concrete slab on grade, masonry exterior walls, wood roof trusses, a gypsum board ceiling with insulation installed on top of the ceiling and the attic vented to the outside, wood roof sheathing, a standing seam metal roof covering on a 2:12 sloped shed roof, wall furring and cavity wall insulation installed on the inside of masonry exterior walls, a toilet room accessible to the disabled, a shower room with a transfer shower accessible to the disabled, a locker room accessible to the disabled, interior doors, and finishes. The new addition is required to be served by a route that is accessible to the disabled. A new opening in an existing masonry wall will be created for access between the existing building and the building addition. A steel header, steel jambs, and steel columns to resist out-of-plane lateral loads will be provided at the new opening. A new door will be installed in the opening. Special Inspection is required for soils, concrete, masonry, anchors post-installed in hardened concrete and masonry, and welding. Work also includes a 16’ x 30’ trash enclosure that is open to the sky with concrete footings, concrete foundations, masonry walls 8 feet tall, concrete slab on grade, a steel side hinged personnel door, steel gates, and bollards. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/27/20189/28/20189/28/2018APASS
DetailsMike Jordan
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. OK for perm occ.
BLD-Final9/19/20189/19/20189/19/2018PPEND
DetailsMike Jordan
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. Need final inspection letter from special inspection agency.
FIRE-Final Inspection8/29/20188/30/20188/30/2018APASS
DetailsTroy Cobbley
life safety passed


Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
BLD-Wall cover7/17/20187/18/20187/18/2018APASS
DetailsMike Jordan
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
BLD-Energy code compliance7/18/20187/18/20187/18/2018APASS
DetailsMike Jordan
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
BLD-Framing/Rough-in7/17/20187/18/20187/18/2018APASS
DetailsMike Jordan
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman. All issues have been resolved. Ok to insulate.
BLD-Framing/Rough-in7/11/20187/12/20187/12/2018PFAIL
DetailsMike Jordan
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman..Complete airseal pack. Install remainder of simpson straps from masonry wall ro new construction. Noted that ADA transfer shower has been installed incorrectly. Seat side does not provide the required 12 inches of clearance beyond.
BLD-Footing5/6/20185/7/20185/7/2018APART
DetailsMike Jordan
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. Work in pogress. Will have special inspection.